Bexar County Capital Projects, and the Column That Hides a Third of Them
Bexar County puts the contractor, the consultant and the construction cost of every capital project on a public map service. The City of San Antonio publishes none of those things anywhere. This page holds the County’s ledger, and it leads with what happens when you read the money column the obvious way.
Construction_Cost is stored as text, and
8 of its values are written with a trailing
dollar sign, like 94000000 $.
A numeric cast, which is what a spreadsheet does by default, skips every one of them.Nothing about the smaller number looks wrong. It has no error, no gap and no warning, and it omits the largest project in the program.
| The projects a numeric cast cannot see | As the County wrote it | Actually |
|---|---|---|
| Alamo Ranch Pkwy | 94000000 $ | $94,000,000 |
| Blanco Road | 38801306.98 $ | $38,801,307 |
| Talley Road | 29753202.05 $ | $29,753,202 |
| Evans Rd | 23000000 $ | $23,000,000 |
| Cagnon Road Bridge | 21500000 $ | $21,500,000 |
| Montgomery Drive | 13298264 $ | $13,298,264 |
| Cimarron Subd | 3200000 $ | $3,200,000 |
| Smithson Valley Road LWC | 2798041.49 $ | $2,798,041 |
What the County publishes that the City does not
The City of San Antonio open-data catalog holds 166 datasets and not one of them is a vendor, contract or spending file. Bexar County puts the contractor, the consultant and the cost on the same public layer as the map.
Where the money is
| Commissioner precinct | Projects | Share |
|---|---|---|
| 1 | 51 | 55% |
| 4 | 17 | 18% |
| 3 | 12 | 13% |
| 2 | 10 | 11% |
| 1/2 | 2 | 2% |
| Who leads the project | Projects | Share |
|---|---|---|
| Bexar County | 50 | 54% |
| not recorded | 30 | 33% |
| TxDOT | 4 | 4% |
| City of San Antonio | 4 | 4% |
| Bexar County Maintained Roadway | 3 | 3% |
| Other Local Agencies | 1 | 1% |
Counts, never money. Two projects span more than one precinct, some name TxDOT or the City rather than the County as the lead, and a third of the record carries no cost at all, so nothing here is a statement about how much each precinct receives.
Contractors and consultants, exactly as recorded
| Contractor | Projects |
|---|---|
| EZ Bell Construction Limited | 7 |
| Harper Brothers Construction | 6 |
| Capital Excavation | 4 |
| Texas Sterling Contruction | 3 |
| Salinas Construction Tech. | 2 |
| J3 Company LLC | 2 |
| J3 | 1 |
| Oscar Renda | 1 |
| Curran Construction | 1 |
| Winters Construction, Inc. | 1 |
| Harper Brothers Construction, LLC | 1 |
| D Plata Construction | 1 |
| Curran Contracting | 1 |
| Yantis Company | 1 |
| Presidio Contracting, LLC | 1 |
| Consultant | Projects |
|---|---|
| Developer | 4 |
| Dannenbaum Engineering | 3 |
| CDS Muery | 3 |
| FNI | 3 |
| Halff & Associates | 3 |
| CP&Y | 3 |
| RPS Infrastructure | 3 |
| Pape-Dawson | 3 |
| TxDOT | 3 |
| Quiddity | 2 |
| Maestas | 2 |
| Stantec Consultant | 2 |
| K. Friese and Associates | 2 |
| Legacy Siteworks Inc | 2 |
| Gozalez De La Garza | 1 |
These are spellings, not companies. The record holds J3 and J3 Company LLC, Curran Construction and Curran Contracting, and one name carrying the County's own typo. Deciding which of those are the same firm is a judgement rather than a reading, and a wrong merge is invisible once it is made, so they are published as written and the number above is a count of spellings.
Why there is no schedule on this page
| Date column | A date | A quarter | A year | In words | Not recorded |
|---|---|---|---|---|---|
| Advertise Date | 31 | 16 | 1 | 10 | 34 |
| Bid Date | 22 | 13 | 1 | 7 | 49 |
| Construction Start | 33 | 16 | 1 | 10 | 32 |
| Construction End | 33 | 15 | 2 | 7 | 35 |
One column holds "3/1/2019", "Q2 2026", "2027" and "Estimated Winter 2026". A duration computed across those is arithmetic on four different kinds of thing, so no start-to-end figure, no delay and no variance is published. The shapes are counted instead, because how a record is written is itself a fact about it.
Every project
| Project | Where | Precinct | Status | Contractor | Construction cost |
|---|---|---|---|---|---|
| Alamo Ranch Pkwy | From Westwood Loop to Calaveras Way | 1 | Design | none named yet | $94,000,000 |
| Blanco Road | Project limits will go from Borgfeld Drive to the Bexar/Comal County Line | 3 | Design | none named yet | $38,801,307 |
| FM 1560 | Along FM 1560 from FM 471 (Culebra Rd) to Galm Rd | 2 | Design | none named yet | $37,220,000 |
| Talley Road | Talley Rd from Wiseman Blvd to Tamaron Pass | 1 | Construction | Capital Excavation | $29,753,202 |
| Grosenbacher North/WT Montgomery Extension | From Canthree Drive to FM 1957 (Potranco Road) including West Grosenbacher | 1 | Design | none named yet | $25,522,994 |
| Evans Rd | From Green Mountain Rd to FM 2252 (Nacogdoches Rd) | 1 | Design | none named yet | $23,000,000 |
| Pct 2 Pavement Restoration | Various Locations in Precinct 2 | 2 | Completed | none named yet | $22,900,121 |
| Talley Road | Talley Rd from Potranco Rd (FM 1957) to Wiseman Blvd | 1 | Completed | Texas Sterling Contruction | $22,305,573 |
| Cagnon Road Bridge | Cagnon Road at the Medina River | 1 | Design | none named yet | $21,500,000 |
| SH 211 | From FM 1957 (Potranco Road) to FM 471 (Culebra Road) | 1 | Completed | Capital Excavation | $19,902,881 |
| Talley Road Phase III | From Tamaron Pass to Old Talley Road. | 1 | Design | none named yet | $17,148,224 |
| Huebner Creek | Along Huebner Creek from 200 lf North of the city limit line between Leon Valley and San Antonio upstream to Bandera Road. | 2 | Completed | Oscar Renda | $16,343,000 |
| Old FM 471 & Talley Road | ld FM 471 from West FM 471 End to East FM 471 End. Talley Road from FM 471 (Culebra Road) to Old Talley Road | 1/2 | Completed | Harper Brothers Construction, LLC | $16,321,273 |
| Montgomery Drive | From Melbury Forest to FM 1976(Gibbs Sprawl) | 4 | Design | none named yet | $13,298,264 |
| Bulverde Rd | Along Bulverde Rd from Marshall Rd to 6,300 ft North of Marshall Rd | 3 | Completed | Harper Brothers Construction | $12,955,794 |
| Old Fredericksburg Road | Old Fredericksburg Road from east of IH10 to north of FM3351 | 3 | Construction | J3 Company LLC | $11,031,155 |
| Galm Road | From FM 471 (Culebra Road) to Government Canyon State Natural Area | 2 | Completed | Capital Excavation | $10,625,931 |
| FM 471 (Culebra Road) | Along FM 471 (Culebra Rd) from SH 211 to Old FM 471 | 1/2 | Construction | Harper Brothers Construction | $10,500,000 |
| Crownwood | Crownwood Subdivision near Crestway. | 4 | Construction | EZ Bell Construction Limited | $10,277,322 |
| Sierra Sunset | From Foster Rd to 350 ft east of Marin Is | 4 | Construction | Texas Sterling Contruction | $10,130,735 |
| W. Military Drive | Pinafore Street to Loop 1604 | 1 | Completed | Harper Brothers Construction | $9,340,000 |
| AT&T Center Parking Drainage & Stabilization Project | This project is located within the AT&T Center / Freeman Coliseum Grounds. | 4 | Construction | Harper Brothers Construction | $9,102,721 |
| Boerne Stage Rd | From the Scenic Loop/Toutant Beauregard intersection to 1,200' West of River Ranch | 3 | Design | none named yet | $9,011,443 |
| Pearsall Road | From Shepherd Road to Kearney Road | 1 | Design | none named yet | $8,586,230 |
| Boerne Stage Rd | Along Boerne Stage Rd from Cross Mountain to 1,200 ft. West of River Ranch | 3 | Construction | Texas Sterling Contruction | $8,319,839 |
| Pearsall Road | From Kearney Road to Loop 1604 | 1 | Design | none named yet | $8,268,809 |
| Crestway Rd | Located in NE Bexar County | 4 | Completed | none named yet | $8,204,632 |
| HSIP Alamo Ranch Pkwy EB Overpass | Alamo Ranch Pkwy at Westwood Loop | 1 | Design | none named yet | $8,163,141 |
| Jarratt Road at Elm Creek and Live Oak Creek Low Water Crossings | The project improves the following low water crossings: - Jarrat Road at Live Oak Creek - Jarrat Road at Unnamed Tributary 1 to Live Oak Creek - Jarrat Road at Unnamed Tributary 8 to Live Oak Creek - Jarrat Road at Elm Creek | 1 | Design | none named yet | $8,000,000 |
| Lucas Creek PER | From WT Montgomery thru the Cinco De Mayo Subdivision | 1 | Planning | none named yet | $8,000,000 |
| Crownwood | Crownwood Subdivision - Serene Ridge to Crestway | 4 | Design | none named yet | $7,700,000 |
| Perrin Beitel Channel Improvements | Along Perrin Beitel Rd from IH 410 to Austin Hwy. Along Beitel Creek from Salado Creek to Vicar Dr | 4 | Completed | Curran Construction | $7,625,000 |
| Ventura Heights Subdivision | Ventura Heights Sub: Heights Valley, Hiker Hollow, Ventura Way, Maple Meadow Dr, Valley Pass, Meadow Ash, Steep Valley, Bent Meadow | 4 | Construction | none named yet | $6,739,746 |
| W.T. Montgomery North Extension | From US 90 to Canthree Drive | 1 | Construction | J3 Company LLC | $6,099,931 |
| Hollowell Rd at Polecat Creek and Tributaries | Hollowell Rd @ Polecat Creek, Hollowell Rd @ Unnamed Tributary 4 to Polecat Creek, & Hollowell Rd @ Unnamed Tributary 5 to Polecat Creek | 1 | Design | none named yet | $6,000,000 |
| Toutant Beauregard at Pecan Creek | Toutant Beauregard at Pecan Creek | 3 | Design | none named yet | $5,750,000 |
| Zigmont Road LWCs | This project is located in east Bexar County, east of China Grove along Zigmont Rd from just South of the Zigmont & Macaway Rd Intersection to 2100 ft south of the Zigmont & Real Rd Intersection | 4 | Design | none named yet | $5,600,000 |
| Watson Road | Located in SW Bexar County | 1 | Completed | Capital Excavation | $5,400,238 |
| W.T. Montgomery North Extension | From US 90 to Canthree Drive | 1 | Completed | none named yet | $5,283,632 |
| Wheeler Road Low Water Crossings (LWCs) | Wheeler Road Low Water Crossings (LWCs) - Two Crossings | 1 | Planning | none named yet | $5,100,000 |
| FM 1560 | Along FM 1560 from Galm Rd to SH 16 (Bandera Rd) | 2 | Design | none named yet | $5,000,000 |
| Spurs Ranch | From US 90 to N. Cagnon Road | 1 | Construction | Harper Brothers Construction | $4,942,300 |
| Pearsall Road Bridge | Pearsall Rd from Shepard Rd to Elm Creek | 1 | Completed | none named yet | $4,500,000 |
| Roft Road | From Rockwall Mill to FM 471 (Culebra Road) | 1 | Bid Phase | none named yet | $4,124,187 |
| Roosevelt Bridge | Roosevelt Ave (TX Spur 536) at Sixmile Creek | 1 | Design | none named yet | $4,000,000 |
| Bridgewood Subdivision | Cascade Canyon, Quarry Ln, Sierra Trail, Colonia, Oro Canyon, Alpine Shore, Clipper Pass, Gideon Rock, Fossil Banks, Caverlier Point, Arrowhead Pool, Elktree Pass, Expedition Creek, Tavern Point, Hallow Pass | 2 | Completed | Winters Construction, Inc. | $3,877,600 |
| Summit Church Road (Marshall Rd) | From US 281 expressway overpass to Bulverde Road. | 3 | Completed | Curran Contracting | $3,667,721 |
| Highland Oaks Subdivision | Black Willow, Little Walnut Dr, Shellnut Dr, Tea Rose Ln, Wild Root Dr, Pocahontas, Deer Run Dr, Memorial Ln | 1 | Completed | Salinas Construction Tech. | $3,576,831 |
| Cimarron Subd | Along West Salitrillo Creek from Flatland Rd to Martinez Dam No. 4. | 4 | Other | none named yet | $3,200,000 |
| Grosenbacher Rd Low Water Crossing | This project is located in west Bexar County just outside of Loop 1604 along Grosenbacher Rd 1700 feet south of Stoney Creek to 1 mile North of US Hwy 90. | 1 | Design | none named yet | $2,861,171 |
| Smithson Valley Road LWC | The existing low water crossing just south of FM 1863 | 3 | Construction | Presidio Contracting, LLC | $2,798,041 |
| Big Geronimo Drainage Project | Big Geronimo in the Geronimo Forest Subdivision | 2 | Design | none named yet | $2,200,000 |
| Fischer Rd | From Quintana Rd to IH 35 S | 1 | Completed | J3 | $2,092,178 |
| The Sanctuary Subdivision | Massive Mt. Antero Mt, Oxford Mt, Bierstadt Mt. | 2 | Completed | D Plata Construction | $1,776,819 |
| Heuermann Rd at Maverick Creek Tributary 6 | Heuerman Road at Maverick Creek Tributary 6, | 3 | Design | none named yet | $1,710,206 |
| McConnell Road at Unnamed Tributary to Elm Creek LWCs | McConnell Road at Unnamed Tributary to Elm Creek crossings | 1 | Construction | Salinas Construction Tech. | $1,466,937 |
| HSIP Foster Rd Medians | Foster Rd from FM 78 to IH-10 | 4 | Planning | none named yet | $1,144,745 |
| W.T. Montgomery North Extension | From US 90 to Canthree Drive | 1 | Construction | Yantis Company | $1,008,590 |
| North Talley Rd LWC | Cartwright Trl Low Water Crossings at Unnamed Tributaries 7 and 8 in Medio Creek | 1 | Completed | Harper Brothers Construction | $620,465 |
| HSIP Alamo Pkwy @ Rockwall Mill/Wild Pine Traffic Signal | Alamo Pkwy @ Rockwall Mill/Wild Pine | 1 | Completed | EZ Bell Construction Limited | $359,575 |
| Talley Rd at Westcreek Vw Traffic Signal | Talley Rd at Westcreek Vw | 1 | Bid Phase | none named yet | $354,509 |
| Foster Rd at Wildflower Way Traffic Signal | Foster Rd at Wildflower Way | 4 | Construction | none named yet | $350,171 |
| Wiseman Blvd at Cottonwood Way Right-Turn | Wiseman Blvd at Cottonwood Way | 1 | Construction | EZ Bell Construction Limited | $350,099 |
| Canyon Golf @ Overlook Parkway Traffic Signal | The intersection of Overlook Parkway and Canyon Golf | 3 | Completed | EZ Bell Construction Limited | $314,002 |
| Borgfeld Dr @ Blanco Rd Traffic Signal | The intersection of Borgfeld Drive and Blanco Road | 3 | Completed | none named yet | $304,364 |
| Pue Road @ Bonavantura Traffic Signal | The intersection of Pue Road and Bonavantura | 1 | Construction | none named yet | $258,187 |
| Westwood Loop and Wild Pine Traffic Signal | Westwood Loop at Wild Pine | 1 | Completed | none named yet | $193,798 |
| HSIP Walzem Rd @ Elm Trl Traffic Signal Upgrades | Walzem Rd @ Elm Trl | 4 | Construction | EZ Bell Construction Limited | $156,668 |
| HSIP Fowler Rd at Hermosa Valley Improvements | Fowler Rd at Hermosa Valley | 1 | Construction | EZ Bell Construction Limited | $149,836 |
| HSIP Jarrat Rd at Edwards Rd Improvements | Jarrat Rd at Edwards Rd | 1 | Construction | EZ Bell Construction Limited | $111,678 |
| W.T. Montgomery North Extension | From US 90 to Canthree Drive | 1 | Completed | none named yet | not recorded |
| Spurs Ranch Phase 2 | Sea Holly, Cup Flower, Begonia Rock, Cape Primrose, Thymus Dr, Butterfly Bush, Winter Cherry (from Cape Primrose to 100ft north of Cup Flower) | 1 | Planning | none named yet | not recorded |
| Evans Road | From Hanging Oak to Green Mountain | 3 | Planning | none named yet | not recorded |
| Talley Road | From 1500 ft North of Alamo Ranch Pkwy to just South of Wonderland Run | 1 | Design | none named yet | not recorded |
| Talley Road | From just South of Wonderland Run to just North of Wonderland Run | 1 | Completed | none named yet | not recorded |
| Masterson Rd | From US Hwy 90 to Hennersby Ln | 1 | Planning | none named yet | not recorded |
| W. T. Montgomery Rd Expansion | From Lucas Creek to Macdona-La Coste Rd | 1 | Planning | none named yet | not recorded |
| Pearsall Rd | From Luckey Rd to Shepherd Rd | 1 | Planning | none named yet | not recorded |
| Pearsall Rd | from Luckey Rd (near IH-35) to Lytle City Limits | 1 | Planning | none named yet | not recorded |
| Scenic Loop Rd | From Babcock Rd to Boerne Stage Rd/Toutant-Beauregard Rd | 1 | Planning | none named yet | not recorded |
| Abbott Rd | From FM 1518 to N Graytown Rd | 1 | Design | none named yet | not recorded |
| N Graytown Rd | From Abbott Rd to Green Rd/Colonial Park | 1 | Planning | none named yet | not recorded |
| Walzem Rd Railroad Overpass | at the Union Pacific RR Xing, from Branching Ct to Congressional Blvd | 4 | Design | none named yet | not recorded |
| S Foster Rd | From Hildebrandt Rd to New Sulfur Springs Rd | 1 | Planning | none named yet | not recorded |
| New Sulfur Springs Rd | From 370' W of Friesenhahn St to Knowlton Rd | 1 | Planning | none named yet | not recorded |
| AT&T Center Project | Just downstream of the railroad on the west side and upstream of the newly constructed concrete lined channel on the east side. Total length of channel will be around 1000 feet. | 4 | Planning | none named yet | not recorded |
| FM 1518 | From FM 78 to IH-10 | 4 | Construction | none named yet | not recorded |
| Bent Canyon Extension | Bent Canyon Road between Prairie Way Blvd and Bricewood Run (0.3 Miles) | 2 | Design | none named yet | not recorded |
| Windfield Subdivision | Streets: Windfield Path, Alonzo Fields, Milani Fields, Aranda Fields, Gilden Fields, Lucky Fields, Bolden Fields, Harbor Fields, Melody Fields, Hatwig Fields, Foster Fields, Hartnet Fields, Peace Fields, Slaton Fields, Uresti Fields, Lyro Fields, Putnam Fields, Taurus Sky, Penta Fields, Tanner Fields, Puente Fields, Andera Fields, Dunlap Fields, Windfield Gap | 4 | Design | none named yet | not recorded |
| Zarzamora Creek PER | From Garza Park to Ingram Road along Zarzamora Creek | 2 | Planning | none named yet | not recorded |
| Marbach Road Extension | 1,000 ft east of Wentwood Rd to the intersection of Wentroad Rd | 1 | Bid Phase | none named yet | not recorded |
| South Texas Parkway | IH 35 to IH 37 | 1 | Planning | none named yet | not recorded |
What this record cannot tell you
- The construction cost column is stored as text and eight values carry a trailing dollar sign. Reading it as a number, which is what a spreadsheet does by default, silently drops those eight projects and a third of the money. Both readings are published here so the difference can be checked.
- A construction cost is what the County records for a project, not what has been spent. There is no expenditure column in this record, so nothing here is a statement about money already paid out.
- Contractor and consultant names are published exactly as the County wrote them. Several look like one firm under two spellings, and one carries a typo. They are deliberately not merged: deciding that two spellings are one company is a judgement, and a wrong merge is invisible once made.
- Most projects have no named contractor. That is usually because one has not been appointed yet rather than because the record is incomplete, and the count is published rather than the blanks being hidden.
- No schedule variance is computed. The four date columns mix real dates, quarters, bare years and phrases such as "Early 2027", so a duration across them would be arithmetic on four different kinds of thing. The shapes are counted instead.
- Not every project here is led by Bexar County. The record names TxDOT, the City of San Antonio and other local agencies on some rows, and leaves the field blank on others.
- Four rows in the layer arrive with every column empty and no location. They are counted as empty rather than treated as projects.
- The names, emails and phone numbers of County project managers are in this layer and are deliberately never read, published or downloaded.
- Precinct is a commissioner precinct, not a City council district, and two projects span more than one. Nothing here is allocated between precincts.
The finding, in one sentence
Eight rows carry a trailing dollar sign, and that is enough.
Construction_Cost is a text column. Most of its values read 4000000.00. Eight of them read 94000000 $, with a space and a dollar sign on the end. Cast the column to a number, which is what a spreadsheet does when you open the file and what ::numeric does in a query, and those eight rows return nothing at all.
The result is $440,953,000 across 70 projects instead of $667,303,815. $226,350,815 vanishes, across 8 projects. The largest of them is Alamo Ranch Pkwy at $94,000,000, which is the biggest single project in the county program and is completely invisible to the naive read.
Nothing about the smaller figure looks wrong. It carries no error, no gap, no warning and no missing-data flag, because from the arithmetic’s point of view nothing is missing: eight strings simply were not numbers. That is the whole class of defect this site exists to publish, and it is the same one the bond ledger records in mirror image, where the money was written $17201615.67 with the symbol in front and a parser that stripped commas but not symbols reported a finished program as zero dollars.
Why the County has this and the City does not
Checked against the City’s own catalog, not assumed.
The City of San Antonio open-data catalog holds 166 datasets. Searched on 2026-08-30 for budget, finance, spending, contract, vendor, payroll, salary, expenditure, checkbook, payment, procurement, revenue, audit and employee, not one dataset matches. The City’s whole finance domain is published as PDF. The bond ledger tool only reaches a vendor name at all by joining into sibling packages on a project number, and even there the current program names nobody.
Bexar County puts Contractor, Consultant and Construction_Cost on the same public layer as the project geometry, queryable without a key. That asymmetry is the reason this page exists: it is not that the County is unusually transparent, it is that the City is unusually quiet, and the contrast is only visible once somebody holds both.
It is also easy to miss. This layer sits on the County’s own map server, and the County’s open-data portal, which is the surface a search engine finds, lists twenty-two datasets of boundaries and census geography and no permits, projects or money at all. The same discovery problem hid a county permit register from us until August 2026.
What is deliberately not here
Three refusals, each because the record cannot support the alternative.
No schedule, no delay and no variance. The four date columns mix real dates, quarters, bare years and phrases like “Estimated Winter 2026” and “Early 2027”, plus one value with a five-digit year. A duration across those is arithmetic on four different kinds of thing. The shapes are counted instead.
No merged company names. The record holds J3 and J3 Company LLC, Curran Construction and Curran Contracting, and a contractor spelled with the County’s own typo. Deciding which of those are one firm is a judgement rather than a reading, and a wrong merge is invisible once made. The counts on this page are counts of spellings and say so.
No project manager names. The source layer carries six fields holding County staff names, their direct email addresses and their direct phone numbers. They are never requested, so they are absent from the file, the download and this page. The bond ledger makes the same refusal about the City’s contact column.
And no money is allocated between precincts. Two projects span more than one, thirty rows name TxDOT or the City rather than the County as the lead agency, and a third of the ledger records no cost at all.
Use the data
The whole ledger as JSON and CSV, with no key and no signup.
sa-county-capital.json carries every project, both readings of the money column, the eight rows the naive parse drops, and the date-shape counts. sa-county-capital.csv carries a row per project.
Every row in the CSV holds construction_cost beside cost_as_written, so the parse can be checked against the County’s own text rather than trusted. That pairing is deliberate: this page is about a column being read wrongly, and a download that published only the parsed figure would be asking for exactly the trust it spends the rest of the page arguing against.
Share it with somebody who opens government CSVs in a spreadsheet.
Other San Antonio tools
Same method, a different public record. Each one states what its record cannot answer.
Crime Map Building Permits Bar & Restaurant Revenue Aggressive Driving Trail Accessibility License Plate Readers Data Centers Data Center Zoning 311 Response Times Data Center Corroboration Data Center Environmental Record Bond Projects Council District Lookup Sheriff Response Times County Capital Projects Police Response Times
All 16 are free, with no signup and no email wall, and the public API behind them needs no key.
Who publishes this
These tools are built and maintained by BrandShyp LLC, a San Antonio software firm. We sell data, software and accessibility work to public agencies and are seeking state and local government contracts. Small business certification with the South Central Texas Regional Certification Agency is in process. We hold no City of San Antonio contract.
No client, agency or sponsor funds, reviews or approves any of these tools, and nothing on these pages is a solicitation. Every figure comes from the public record named below, which is linked and can be queried without us.
Corrections. If a number here disagrees with the record, write to Justice Harker at [email protected] with the figure and the source that contradicts it. Corrections are made on the page, and what changed is noted there rather than replaced silently.
Source. This page reads the Bexar County capital improvement project record, published by Bexar County Public Works. This is a county record, not a City of San Antonio one. The record is linked from the page above and can be queried without us. We claim no rights over the underlying record and add no license of our own to it.