# Bexar County capital improvement projects, from the County's own layer. # construction_cost is parsed after stripping a trailing currency symbol, which eight # rows carry. cost_as_written is the raw text so the parse can be checked. A numeric # cast of the raw column drops those eight rows and a third of the money. # Contractor and consultant names are AS RECORDED and deliberately not merged. project_id,project_name,where,precinct,jurisdiction,work_type,status,consultant,contractor,construction_cost,cost_as_written,advertise,bid,construction_start,construction_end "SA-43B","Roosevelt Bridge","Roosevelt Ave (TX Spur 536) at Sixmile Creek","1","TxDOT","Flood Control - Other","Design","Dannenbaum Engineering","",4000000,"4000000.00","","","","" "21","Pct 2 Pavement Restoration","Various Locations in Precinct 2","2","","Pavement Restoration","Completed","","",22900120.7,"22900120.70","","","","" "F26","Hollowell Rd at Polecat Creek and Tributaries","Hollowell Rd @ Polecat Creek, Hollowell Rd @ Unnamed Tributary 4 to Polecat Creek, & Hollowell Rd @ Unnamed Tributary 5 to Polecat Creek","1","Bexar County","Flood Control - LWC Improvements","Design","","",6000000,"6000000","Q2 2026","","Q3 2026","Q3 2027" "A10","Highland Oaks Subdivision","Black Willow, Little Walnut Dr, Shellnut Dr, Tea Rose Ln, Wild Root Dr, Pocahontas, Deer Run Dr, Memorial Ln","1","Bexar County","Road Reconstruction","Completed","CDS Muery","Salinas Construction Tech.",3576831,"3576831.00","3/1/2019","","7/1/2019","7/1/2020" "MR-50","McConnell Road at Unnamed Tributary to Elm Creek LWCs","McConnell Road at Unnamed Tributary to Elm Creek crossings","1","","Flood Control - LWC Improvements","Construction","Quiddity","Salinas Construction Tech.",1466936.5,"1466936.5","Q1 2025","Q1 2025","Q2 2025","Q4 2025" "MR-11","Pearsall Road Bridge","Pearsall Rd from Shepard Rd to Elm Creek","1","Bexar County","Flood Control - LWC Removal","Completed","Gozalez De La Garza","",4500000,"4500000.00","","","","" "A8","Watson Road","Located in SW Bexar County","1","","Road Expansion","Completed","Don Duurden dba CEC","Capital Excavation",5400238.27,"5400238.27","7/1/2020","9/17/2021","5/2/2022","10/1/2021" "A9","Fischer Rd","From Quintana Rd to IH 35 S","1","City of San Antonio","Road Expansion","Completed","Garza EMC","J3",2092178.16,"2092178.16","6/7/2019","","10/28/2019","7/1/2020" "A5","Spurs Ranch","From US 90 to N. Cagnon Road","1","","Road Expansion","Construction","FNI","Harper Brothers Construction",4942300,"4942300","","","4/3/2023","4/17/2025" "MR-30","Grosenbacher Rd Low Water Crossing","This project is located in west Bexar County just outside of Loop 1604 along Grosenbacher Rd 1700 feet south of Stoney Creek to 1 mile North of US Hwy 90.","1","Bexar County","Flood Control - LWC Removal","Design","Maestas","",2861170.91,"2861170.91","10/1/20265","11/13/2026","1/11/2027","1/10/2028" "IFB 2022-005D","W.T. Montgomery North Extension","From US 90 to Canthree Drive","1","Bexar County","Road Expansion","Completed","Developer","",,"","","3/3/2025","3/25/2025","1/30/2026" "A1","Grosenbacher North/WT Montgomery Extension","From Canthree Drive to FM 1957 (Potranco Road) including West Grosenbacher","1","Bexar County","Road Expansion","Design","Halff & Associates","",25522994,"25522994","9/12/2027","10/15/2027","1/3/2028","12/28/2029" "0915-12-581","Talley Road","Talley Rd from Wiseman Blvd to Tamaron Pass","1","Bexar County Maintained Roadway","Road Expansion","Construction","CP&Y","Capital Excavation",29753202.05,"29753202.05 $","10/27/2024","12/13/2024","Q2 2025","Q2 2027" "A13","Westwood Loop and Wild Pine Traffic Signal","Westwood Loop at Wild Pine","1","Bexar County","Intersection Operational Improvements","Completed","RPS Infrastructure","",193798,"193798.00","","","4/1/2020","1/1/2021" "LC-17","Huebner Creek","Along Huebner Creek from 200 lf North of the city limit line between Leon Valley and San Antonio upstream to Bandera Road.","2","Other Local Agencies","Flood Control - Other","Completed","Vickrey Engineers","Oscar Renda",16343000,"16343000.00","6/1/2016","","3/6/2017","5/30/2020" "MR-10","North Talley Rd LWC","Cartwright Trl Low Water Crossings at Unnamed Tributaries 7 and 8 in Medio Creek","1","Bexar County","Flood Control - LWC Removal","Completed","FNI","Harper Brothers Construction",620464.94,"620464.94","1/19/2020","2/21/2020","8/3/2020","2/2/2021" "39","Roft Road","From Rockwall Mill to FM 471 (Culebra Road)","1","Bexar County","Road Reconstruction","Bid Phase","ARCADIS","",4124186.9,"4124186.9","Q2 2026","Q2 2026","Q3 2026","Q1 2027" "SC-09","Perrin Beitel Channel Improvements","Along Perrin Beitel Rd from IH 410 to Austin Hwy. Along Beitel Creek from Salado Creek to Vicar Dr","4","City of San Antonio","Flood Control - Other","Completed","LNV Engineers","Curran Construction",7625000,"7625000.00","8/1/2016","","2/6/2017","5/30/2020" "A32","Bridgewood Subdivision","Cascade Canyon, Quarry Ln, Sierra Trail, Colonia, Oro Canyon, Alpine Shore, Clipper Pass, Gideon Rock, Fossil Banks, Caverlier Point, Arrowhead Pool, Elktree Pass, Expedition Creek, Tavern Point, Hallow Pass","2","Bexar County","Road Reconstruction","Completed","LNV","Winters Construction, Inc.",3877600,"3877600.00","1/11/2019","6/23/2020","5/27/2019","10/1/2020" "BC02","Old FM 471 & Talley Road","ld FM 471 from West FM 471 End to East FM 471 End. Talley Road from FM 471 (Culebra Road) to Old Talley Road","1/2","","Road Expansion","Completed","Dannenbaum Engineering","Harper Brothers Construction, LLC",16321273,"16321273.00","7/21/2019","","11/25/2019","10/1/2022" "3544-04-002","SH 211","From FM 1957 (Potranco Road) to FM 471 (Culebra Road)","1","","Road Expansion","Completed","Pape-Dawson","Capital Excavation",19902880.71,"19902880.71","8/30/2020","10/2/2020","1/4/2021","11/14/2022" "TxDOT2","FM 471 (Culebra Road)","Along FM 471 (Culebra Rd) from SH 211 to Old FM 471","1/2","TxDOT","Road Expansion","Construction","TxDOT","Harper Brothers Construction",10500000,"10500000","Q3 2021","Q3 2021","Q2 2022","Q1 2027" "A56","Crestway Rd","Located in NE Bexar County","4","","Road Reconstruction","Completed","Halff & Associates","",8204631.7,"8204631.7","2/13/2022","3/25/2022","11/7/2022","10/24/2024" "2230-01-020","FM 1560","Along FM 1560 from FM 471 (Culebra Rd) to Galm Rd","2","TxDOT","Road Expansion","Design","TxDOT","",37220000,"37220000","","","Fall 2025","Summer 2028" "CB-09","Cimarron Subd","Along West Salitrillo Creek from Flatland Rd to Martinez Dam No. 4.","4","","Flood Control - LWC Removal","Other","Givler Engineers","",3200000,"3200000 $","","","","" "0915-12-544","Galm Road","From FM 471 (Culebra Road) to Government Canyon State Natural Area","2","City of San Antonio","Road Expansion","Completed","HNTB","Capital Excavation",10625931.02,"10625931.02","10/17/2021","11/23/2021","5/9/2022","4/29/2024" "2230-01-021","FM 1560","Along FM 1560 from Galm Rd to SH 16 (Bandera Rd)","2","TxDOT","Road Expansion","Design","TxDOT","",5000000,"5000000","","","","" "A31","The Sanctuary Subdivision","Massive Mt. Antero Mt, Oxford Mt, Bierstadt Mt.","2","Bexar County","Road Reconstruction","Completed","RPS Infrastructure","D Plata Construction",1776819,"1776819.00","8/23/2019","6/23/2020","1/21/2020","10/1/2020" "LC49","Heuermann Rd at Maverick Creek Tributary 6","Heuerman Road at Maverick Creek Tributary 6,","3","City of San Antonio","Flood Control - LWC Improvements","Design","BGE, Inc.","",1710206,"1710206","TBD","TBD","TBD","TBD" "A45","Summit Church Road (Marshall Rd)","From US 281 expressway overpass to Bulverde Road.","3","","Road Expansion","Completed","Poznecki-Camarillo","Curran Contracting",3667720.54,"3667720.54","5/18/2018","","12/3/2018","7/1/2020" "IFB 2023-002","Boerne Stage Rd","Along Boerne Stage Rd from Cross Mountain to 1,200 ft. West of River Ranch","3","Bexar County","Road Operational Improvements","Construction","Pape Dawson","Texas Sterling Contruction",8319839,"8319839","12/1/2022","Jan 2023","5/1/2023","8/1/2025" "A46","Bulverde Rd","Along Bulverde Rd from Marshall Rd to 6,300 ft North of Marshall Rd","3","","Road Expansion","Completed","LAN, Inc.","Harper Brothers Construction",12955794.39,"12955794.39","7/1/2020","","10/1/2020","4/12/2024" "7","Old Fredericksburg Road","Old Fredericksburg Road from east of IH10 to north of FM3351","3","Bexar County","Road Operational Improvements","Construction","Stantec Consultant","J3 Company LLC",11031155,"11031155","10/4/2025","11/8/2024","Jan 2025","May 2027" "LC-34","Toutant Beauregard at Pecan Creek","Toutant Beauregard at Pecan Creek","3","","Flood Control - LWC Improvements","Design","Stantec Consultant","",5750000,"5750000","TBD","TBD","2027","2028" "008238","Sierra Sunset","From Foster Rd to 350 ft east of Marin Is","4","Bexar County","Pavement Restoration","Construction","RPS Infrastructure","Texas Sterling Contruction",10130734.9,"10130734.9","Q1 2025","","Q2 2025","Q2 2027" "A4","Spurs Ranch Phase 2","Sea Holly, Cup Flower, Begonia Rock, Cape Primrose, Thymus Dr, Butterfly Bush, Winter Cherry (from Cape Primrose to 100ft north of Cup Flower)","1","","Road Reconstruction","Planning","","",,"","","","","" "F24","Wheeler Road Low Water Crossings (LWCs)","Wheeler Road Low Water Crossings (LWCs) - Two Crossings","1","Bexar County","Flood Control - LWC Improvements","Planning","FNI","",5100000,"5100000","Estimated Winter 2026","","Jun 2026","Jun 2027" "F22","Cagnon Road Bridge","Cagnon Road at the Medina River","1","Bexar County","Flood Control - LWC Removal","Design","","",21500000,"21500000 $","October 2025","November 2025","1/5/2026","12/31/2026" "A2","Pearsall Road","From Kearney Road to Loop 1604","1","Bexar County","Road Reconstruction","Design","C C Carleton","",8268809.27,"8268809.27","9/14/2025","10/17/2025","1/5/2026","7/30/2027" "A3","Pearsall Road","From Shepherd Road to Kearney Road","1","Bexar County","Road Reconstruction","Design","","",8586230,"8586230.00","3/22/2026","4/17/2026","7/6/2026","12/31/2027" "PTNL08","Evans Road","From Hanging Oak to Green Mountain","3","Bexar County","Road Expansion","Planning","","",,"","","","","" "RMA02","Montgomery Drive","From Melbury Forest to FM 1976(Gibbs Sprawl)","4","","Road Reconstruction","Design","","",13298264,"13298264 $","Q4 2026","Q4 2026","","" "IFB 2019-011","Talley Road","Talley Rd from Potranco Rd (FM 1957) to Wiseman Blvd","1","Bexar County Maintained Roadway","Road Expansion","Completed","CP&Y","Texas Sterling Contruction",22305572.62,"22305572.62","6/28/2019","8/14/2019","","" "205-49-01CDE","Talley Road Phase III","From Tamaron Pass to Old Talley Road.","1","Bexar County","Road Expansion","Design","","",17148223.99,"17148223.99","Q1 2026","Q2 2026","Q2 2026","Q2 2028" "205-49-01B","Talley Road","From 1500 ft North of Alamo Ranch Pkwy to just South of Wonderland Run","1","Bexar County","Road Expansion","Design","","",,"","","","","" "205-49-01A","Talley Road","From just South of Wonderland Run to just North of Wonderland Run","1","Bexar County","Road Expansion","Completed","","",,"","","","","" "IFB 2022-005AB","W.T. Montgomery North Extension","From US 90 to Canthree Drive","1","Bexar County","Road Expansion","Construction","Developer","J3 Company LLC",6099930.84,"6099930.84","","","","" "IFB 2022-005C","W.T. Montgomery North Extension","From US 90 to Canthree Drive","1","Bexar County","Road Expansion","Construction","Developer","Yantis Company",1008589.75,"1008589.75","","","","" "IFB 2022-005EF","W.T. Montgomery North Extension","From US 90 to Canthree Drive","1","Bexar County","Road Expansion","Completed","Developer","",5283632.4,"5283632.4","October 27, 2024","December 6, 2024","March 10, 2025","December 15, 2025" "RMA01","Alamo Ranch Pkwy","From Westwood Loop to Calaveras Way","1","Bexar County","Road Expansion","Design","","",94000000,"94000000 $","Q1 2027","Q2 2027","Q2 2027","Q2 2030" "PTNL04","Masterson Rd","From US Hwy 90 to Hennersby Ln","1","Bexar County","Unfunded","Planning","","",,"","","","","" "PTNL03","W. T. Montgomery Rd Expansion","From Lucas Creek to Macdona-La Coste Rd","1","Bexar County","Unfunded","Planning","","",,"","","","","" "PTNL12","Pearsall Rd","From Luckey Rd to Shepherd Rd","1","Bexar County","Unfunded","Planning","","",,"","","","","" "PTNL11","Pearsall Rd","from Luckey Rd (near IH-35) to Lytle City Limits","1","Bexar County","Unfunded","Planning","","",,"","","","","" "RMA04","Evans Rd","From Green Mountain Rd to FM 2252 (Nacogdoches Rd)","1","Bexar County","Road Expansion","Design","","",23000000,"23000000 $","","","","" "PTNL14","Scenic Loop Rd","From Babcock Rd to Boerne Stage Rd/Toutant-Beauregard Rd","1","Bexar County","Unfunded","Planning","","",,"","","","","" "RMA05","Abbott Rd","From FM 1518 to N Graytown Rd","1","Bexar County","Road Expansion","Design","","",,"","","","","" "PTNL07","N Graytown Rd","From Abbott Rd to Green Rd/Colonial Park","1","Bexar County","Unfunded","Planning","","",,"","","","","" "RMA03","Walzem Rd Railroad Overpass","at the Union Pacific RR Xing, from Branching Ct to Congressional Blvd","4","Bexar County","Road Operational Improvements","Design","","",,"","","","","" "PTNL13","S Foster Rd","From Hildebrandt Rd to New Sulfur Springs Rd","1","Bexar County","Unfunded","Planning","","",,"","","","","" "PTNL10","New Sulfur Springs Rd","From 370' W of Friesenhahn St to Knowlton Rd","1","Bexar County","Unfunded","Planning","","",,"","","","","" "A33","Blanco Road","Project limits will go from Borgfeld Drive to the Bexar/Comal County Line","3","","Road Expansion","Design","CP&Y","",38801306.98,"38801306.98 $","Q3 2025","Q3 2025","March 2026","" "SA-18","Zigmont Road LWCs","This project is located in east Bexar County, east of China Grove along Zigmont Rd from just South of the Zigmont & Macaway Rd Intersection to 2100 ft south of the Zigmont & Real Rd Intersection","4","Bexar County","Flood Control - LWC Removal","Design","RPS","",5600000,"5600000","1/13/2027","2/19/2027","3/15/2027","3/14/2028" "IFB 2024-001","AT&T Center Parking Drainage & Stabilization Project","This project is located within the AT&T Center / Freeman Coliseum Grounds.","4","Bexar County","Flood Control - LWC Removal","Construction","CDS Muery","Harper Brothers Construction",9102720.85,"9102720.85","10/20/2023","12/1/2023","3/13/2024","8/1/2025" "84","Ventura Heights Subdivision","Ventura Heights Sub: Heights Valley, Hiker Hollow, Ventura Way, Maple Meadow Dr, Valley Pass, Meadow Ash, Steep Valley, Bent Meadow","4","","Pavement Restoration","Construction","Dannenbaum Engineering","",6739746,"6739746","Q4 2024","","Q1 2025","Q2 2026" "CRWN-2","Crownwood","Crownwood Subdivision - Serene Ridge to Crestway","4","Bexar County","Pavement Restoration","Design","Sanchez-Salazar","",7700000,"7700000","6/1/2026","","9/1/2026","9/1/2027" "Big Geronimo","Big Geronimo Drainage Project","Big Geronimo in the Geronimo Forest Subdivision","2","Bexar County","Flood Control - Other","Design","Maestas","",2200000,"2200000","10/1/2025","","2/1/2026","2/1/2027" "CRWN-1","Crownwood","Crownwood Subdivision near Crestway.","4","","Road Operational Improvements","Construction","K. Friese and Associates","EZ Bell Construction Limited",10277322,"10277322","10/1/2024","","2/10/2025","4/6/2026" "IFB 2026-XXX","Boerne Stage Rd","From the Scenic Loop/Toutant Beauregard intersection to 1,200' West of River Ranch","3","Bexar County","Road Operational Improvements","Design","Quiddity","",9011443,"9011443","Fall 2026","TBD","Early 2027","2029" "222","AT&T Center Project","Just downstream of the railroad on the west side and upstream of the newly constructed concrete lined channel on the east side. Total length of channel will be around 1000 feet.","4","Bexar County","Flood Control - Other","Planning","CDS Muery","",,"","","","2/1/2027","2/1/2028" "0465-02-027","FM 1518","From FM 78 to IH-10","4","","Road Expansion","Construction","","",,"","","","Q2 2024","TBD" "0915-12-741a","HSIP Alamo Pkwy @ Rockwall Mill/Wild Pine Traffic Signal","Alamo Pkwy @ Rockwall Mill/Wild Pine","1","Bexar County","New Signalized Intersection","Completed","","EZ Bell Construction Limited",359574.69,"359574.69","3/8/2025","4/3/2025","8/18/2025","2/10/2026" "BC05","W. Military Drive","Pinafore Street to Loop 1604","1","","Road Reconstruction","Completed","K. Friese and Associates","Harper Brothers Construction",9340000,"9340000","1/30/2022","3/4/2022","Q4 2022","Q4 2025" "0915-12-800","HSIP Alamo Ranch Pkwy EB Overpass","Alamo Ranch Pkwy at Westwood Loop","1","Bexar County","Road Operational Improvements","Design","Legacy Siteworks Inc","",8163140.7,"8163140.7","October 2026","November 2026","January 2027","December 2027" "0915-12-741b","HSIP Walzem Rd @ Elm Trl Traffic Signal Upgrades","Walzem Rd @ Elm Trl","4","","Intersection Operational Improvements","Construction","","EZ Bell Construction Limited",156668.33,"156668.33","Q1 2025","Q3 2025","8/18/2025","12/4/2025" "0915-12-741c","HSIP Jarrat Rd at Edwards Rd Improvements","Jarrat Rd at Edwards Rd","1","Bexar County","Intersection Operational Improvements","Construction","","EZ Bell Construction Limited",111678.38,"111678.38","Q1 2025","Q3 2025","10/27/2025","11/14/2025" "0915-12-741d","HSIP Fowler Rd at Hermosa Valley Improvements","Fowler Rd at Hermosa Valley","1","Bexar County","Intersection Operational Improvements","Construction","","EZ Bell Construction Limited",149835.79,"149835.79","Q1 2025","Q3 2025","10/6/2025","11/14/2025" "0915-12-XX2","HSIP Foster Rd Medians","Foster Rd from FM 78 to IH-10","4","","Road Operational Improvements","Planning","Legacy Siteworks Inc","",1144744.97,"1144744.97","2027","2027","","" "2024-005","Foster Rd at Wildflower Way Traffic Signal","Foster Rd at Wildflower Way","4","Bexar County","New Signalized Intersection","Construction","","",350171.42,"350171.42","September 1, 2024","October 4, 2024","July 2025","Feb 2026" "2025-010","Talley Rd at Westcreek Vw Traffic Signal","Talley Rd at Westcreek Vw","1","Bexar County","New Signalized Intersection","Bid Phase","","",354508.55,"354508.55","Q2 2025","Q2 2025","Q1 2026","Q2 2026" "Bent Cnyn","Bent Canyon Extension","Bent Canyon Road between Prairie Way Blvd and Bricewood Run (0.3 Miles)","2","","Road Expansion","Design","Pape-Dawson","",,"","Q4 2026","Q4 2026","Q4 2026","Q3 2027" "IFB 2024-004","Canyon Golf @ Overlook Parkway Traffic Signal","The intersection of Overlook Parkway and Canyon Golf","3","","New Signalized Intersection","Completed","","EZ Bell Construction Limited",314001.64,"314001.64","","","Q4 2024","Q1 2025" "IFB 2024-003","Pue Road @ Bonavantura Traffic Signal","The intersection of Pue Road and Bonavantura","1","","New Signalized Intersection","Construction","","",258187.33,"258187.33","6/16/2024","7/12/2024","Q1 2025","Q2 2025" "IFB 2024-002","Borgfeld Dr @ Blanco Rd Traffic Signal","The intersection of Borgfeld Drive and Blanco Road","3","","New Signalized Intersection","Completed","","",304363.65,"304363.65","1/7/2024","2/2/2024","Q1 2024","Q3 2024" "IFB 2024-JRT","Jarratt Road at Elm Creek and Live Oak Creek Low Water Crossings","The project improves the following low water crossings: - Jarrat Road at Live Oak Creek - Jarrat Road at Unnamed Tributary 1 to Live Oak Creek - Jarrat Road at Unnamed Tributary 8 to Live Oak Creek - Jarrat Road at Elm Creek","1","Bexar County","Flood Control - LWC Improvements","Design","","",8000000,"8000000","","","TBD","TBD" "Windfield Subdivision","Windfield Subdivision","Streets: Windfield Path, Alonzo Fields, Milani Fields, Aranda Fields, Gilden Fields, Lucky Fields, Bolden Fields, Harbor Fields, Melody Fields, Hatwig Fields, Foster Fields, Hartnet Fields, Peace Fields, Slaton Fields, Uresti Fields, Lyro Fields, Putnam Fields, Taurus Sky, Penta Fields, Tanner Fields, Puente Fields, Andera Fields, Dunlap Fields, Windfield Gap","4","","Road Reconstruction","Design","","",,"","Q2 2027","Q2 2027","","" "SV Road LWC","Smithson Valley Road LWC","The existing low water crossing just south of FM 1863","3","","Flood Control - Other","Construction","Halff & Associates","Presidio Contracting, LLC",2798041.49,"2798041.49 $","8/4/2025","8/29/2025","January 2026","October 2026" "Lucas Creek PER","Lucas Creek PER","From WT Montgomery thru the Cinco De Mayo Subdivision","1","","Flood Control - LWC Improvements","Planning","","",8000000,"8000000","Estimated Winter 2028","","Jan 2028","" "Zarzamora Creek PER","Zarzamora Creek PER","From Garza Park to Ingram Road along Zarzamora Creek","2","","Flood Control - LWC Improvements","Planning","","",,"","","","","" "Marbach Ext","Marbach Road Extension","1,000 ft east of Wentwood Rd to the intersection of Wentroad Rd","1","","Road Expansion","Bid Phase","Pape-Dawson","",,"","7/12/26","8/14/26","","" "RMA06","South Texas Parkway","IH 35 to IH 37","1","","Road Expansion","Planning","","",,"","","","","" "IFB 2026-002","Wiseman Blvd at Cottonwood Way Right-Turn","Wiseman Blvd at Cottonwood Way","1","Bexar County Maintained Roadway","Intersection Operational Improvements","Construction","","EZ Bell Construction Limited",350099.49,"350099.49","April 10, 2026","May 14, 2026","",""