    "money": {
        "approved": 2050000000,
        "spent": 1069468345,
        "spent_pct": 52.2,
        "field_used": "Bond Budget and Bond Expenditures",
        "field_coverage": {
            "bond_budget": 99.2,
            "bond_expenditures": 98.6,
            "total_budget": 25.9
        },
        "do_not_use_total_budget": "The field named \"Total Budget\" is a recorded ZERO on 274 of 370 projects, not a blank, and the record does not say whether that means no separate budget or none entered. Summing it against Total Expenditures reports spending at 602.5% of budget.",
        "a_rate_lives_inside_one_pair": "Four divisions are refused: Total Expenditures by Total Budget, Bond Expenditures by Total Budget, Total Expenditures by Bond Budget, and any of those summed citywide before dividing.",
        "do_not_blend_programmes": "The citywide spend rate is published only beside the two program rates. They are at different stages, and a single blended figure describes neither.",
        "programme_rates": [
            {
                "programme": "2017",
                "spent_pct": 86
            },
            {
                "programme": "2022",
                "spent_pct": 28.5
            }
        ]
    },
    "field_coverage": {
        "total_budget": {
            "field": "Total Budget",
            "positive": 96,
            "recorded_zero": 274,
            "blank": 0,
            "of": 370,
            "coverage": 25.9,
            "counts": "coverage is the share of projects carrying a figure above zero"
        },
        "total_spent": {
            "field": "Total Expenditures",
            "positive": 366,
            "recorded_zero": 4,
            "blank": 0,
            "of": 370,
            "coverage": 98.9,
            "counts": "coverage is the share of projects carrying a figure above zero"
        },
        "approved": {
            "field": "Bond Budget",
            "positive": 367,
            "recorded_zero": 3,
            "blank": 0,
            "of": 370,
            "coverage": 99.2,
            "counts": "coverage is the share of projects carrying a figure above zero"
        },
        "spent": {
            "field": "Bond Expenditures",
            "positive": 365,
            "recorded_zero": 5,
            "blank": 0,
            "of": 370,
            "coverage": 98.6,
            "counts": "coverage is the share of projects carrying a figure above zero"
        }
    },
    "what_a_naive_sum_reports": {
        "total_budget_sum": 260410572,
        "total_spent_sum": 1569041480,
        "reported_spend_of_budget_pct": 602.5,
        "note": "What summing the two fields named \"Total Budget\" and \"Total Expenditures\" reports. It is arithmetic over a field that is blank on most projects, which is why this page does not publish it as a finding."
    },
    "schedule_variance_days": null,
    "planned_versus_actual_completion_date": null,
    "cost_overrun": null,
    "schedule_record": {
        "end_dates_that_are_a_season": 356,
        "end_dates_blank": 14,
        "end_dates_that_are_a_date": 0,
        "note": "Every recorded construction end is a season, never a date, so no independent schedule variance can be computed from this record. The City's own Current Status flag is the only schedule judgement available and this tool reports it as such.",
        "past_due_incomplete": 0,
        "of_those_flagged_on_schedule": 0,
        "examples": [],
        "what_zero_would_mean": "A count of zero here is consistent with the City keeping these dates current, and equally consistent with a date being rolled forward each time a project slips. This record carries no history of previous end dates, so it cannot distinguish the two, and this tool does not claim to."
    },
    "district_money": {
        "placed_in_one_district_pct": 75,
        "never_allocated": {
            "multi": {
                "label": "Spans several council districts",
                "projects": 23,
                "approved": 307130000,
                "spent": 105840917,
                "share_of_money": 15
            },
            "citywide": {
                "label": "Citywide (CW)",
                "projects": 18,
                "approved": 205167000,
                "spent": 88484114,
                "share_of_money": 10
            },
            "none": {
                "label": "No district recorded",
                "projects": 0,
                "approved": 0,
                "spent": 0,
                "share_of_money": 0
            }
        }
    },
    "status_as_recorded": {
        "On Schedule": 324,
        "Off Schedule": 40,
        "Cancelled": 6
    },
    "phases_as_recorded": {
        "Complete": 243,
        "Construction": 75,
        "Design": 45,
        "Cancelled": 6,
        "Pre-Design": 1
    },
    "complete_but_off_schedule": [
        "The Alamo Area Plaza",
        "Bynum Ave Ph2 (W Mayfield Blvd-W Gerald Av)",
        "Al Forge Park",
        "Benavides Park",
        "Calderon Clubhouse (Boys & Girls Clubs of SA)",
        "Eastside Clubhouse (Boys&GirlsClubsofSA)",
        "Greater Love Multigenerational & Rec Ctr",
        "San Antonio Botanical Center"
    ],
    "cancelled": [
        {
            "project": "Lone Star Boulevard (Area Streets)",
            "programme": "2017",
            "district": "05",
            "approved": 62000,
            "spent": 62657
        },
        {
            "project": "Aquatic Center at Palo Alto College",
            "programme": "2017",
            "district": "04",
            "approved": 0,
            "spent": 0
        },
        {
            "project": "Harvey E. Najim YMCA  Phase 2",
            "programme": "2017",
            "district": "03",
            "approved": 50000,
            "spent": 49802
        },
        {
            "project": "O.P. Schnabel Park Multi-Generational Center",
            "programme": "2017",
            "district": "07",
            "approved": 11000,
            "spent": 0
        },
        {
            "project": "Sports Education Facility",
            "programme": "2017",
            "district": "02",
            "approved": 2000,
            "spent": 1854
        },
        {
            "project": "District 4 Multigenerational Recreational",
            "programme": "2022",
            "district": "04",
            "approved": 0,
            "spent": 0
        }
    ],
    "what_this_record_cannot_say": {
        "schedule_variance": "No project carries a real date. 356 of 370 construction ends are a season and 14 are blank, so no independent measure of lateness exists.",
        "the_city_flag_is_current": "Measured: no project sits past its own stated end while still incomplete. That is consistent with the City keeping these dates current, and equally consistent with a date being rolled forward whenever a project slips. The record carries no history of previous end dates, so it cannot distinguish the two and this API does not claim either. There is no \"flagged on schedule but actually late\" finding to make here.",
        "cost_overrun": "Not computable. The budget field that would be the denominator is recorded on a minority of projects, and approved bond money is an authorisation rather than an estimate of final cost.",
        "geography": "A project carries one recorded point, not the extent of the work. A street or drainage project covers a corridor no single pin describes."
    },
    "programme_2012": {
        "programme": "2012",
        "projects": 138,
        "budget": 738060422,
        "spent": 653521308,
        "spent_pct": 88.5,
        "status": {
            "COMPLETE": 123,
            "UNDER CONSTRUCTION": 10,
            "UNDER DESIGN": 4,
            "PRE-CONSTRUCTION": 1
        },
        "with_consultant": 131,
        "with_contractor": 119,
        "vendor_coverage_pct": 94.9,
        "sources": [
            "564702ab-0289-4e0c-9fe6-21d5fbbf1d64",
            "b8dee267-9f57-41a0-88ca-bc9b5c03b4f9"
        ],
        "never_sum": "These figures are never added to the headline total on this page. The 2012 files record money in columns named Project Budget and Project Expenditures; the current list records it in columns named Bond Budget and Bond Expenditures. Nothing in the record says those mean the same thing, and this package publishes no data dictionary, so they are reported side by side and never summed.",
        "why_it_matters": "The oldest program is the best documented one. The City names a consultant or contractor on almost every 2012 project, on a minority of 2017 projects, and on none in the current list.",
        "projects_list": [
            {
                "project_no": "40-00300",
                "name": "Downtown Streets Reconstruction",
                "scope": "Downtown Streets Reconstruction This project provides funds for reconstruction and\/or realignment of Market Street, Bowie Street, Main Avenue, Soledad Street, Frio Street, Commerce Street, San Pedro Avenue, and Navarro Street to include pedestrian and bi",
                "status": "UNDER DESIGN",
                "function": "TRANSPORTATION",
                "budget": 66401184.43,
                "spent": 55895004.09,
                "consultant": "Various",
                "contractor": ""
            },
            {
                "project_no": "40-00420",
                "name": "Hausman Road (Loop 1604 to IH 10)",
                "scope": "Hausman Road (Loop 1604 to IH 10) This project provides funds to widen and reconstruct Hausman with additional travel lanes, curbs, sidewalks, bicycle lanes, traffic signals and drainage improvements as needed. The project includes a drainage funding com",
                "status": "COMPLETE",
                "function": "TRANSPORTATION",
                "budget": 61332383.43,
                "spent": 55965251.76,
                "consultant": "",
                "contractor": "Sundt Construction"
            },
            {
                "project_no": "40-00427",
                "name": "Seeling Channel Phase II Drainage",
                "scope": "Seeling Channel Phase II Drainage Reconstruct Seeling Channel, from Wilson to Morning Glory, to improve drainage and minimize flooding. This is a continuation of the Phase I project funded from the 2007-2012 Bond Program.",
                "status": "COMPLETE",
                "function": "PUBLIC HEALTH & SAFETY",
                "budget": 32228206.2,
                "spent": 29950557.27,
                "consultant": "AECOM, Inc.",
                "contractor": "Quest Civil Constructors"
            },
            {
                "project_no": "40-00317",
                "name": "US 281\/Loop 1604 Northern Interchange",
                "scope": "US 281\/Loop 1604 Northern Interchange Contribute funds for the construction of northern connector ramps at the U.S. 281 \/ Loop 1604 interchange that will complete all-direction connectivity between these roadways. TxDOT will be a partner in this project.",
                "status": "UNDER CONSTRUCTION",
                "function": "TRANSPORTATION",
                "budget": 26000000,
                "spent": 26000000,
                "consultant": "",
                "contractor": ""
            },
            {
                "project_no": "40-00312",
                "name": "Ray Ellison Blvd (410 to Old Pearsall Rd",
                "scope": "Ray Ellison Blvd (410 to Old Pearsall Rd) This project provides funds to reconstruct Ray Ellison to four lanes, with curbs, sidewalks, bicycle facilities, driveway approaches, and necessary signal and drainage improvements.",
                "status": "COMPLETE",
                "function": "TRANSPORTATION",
                "budget": 25660677.78,
                "spent": 22287135,
                "consultant": "Pape-Dawson Engineers, Inc.",
                "contractor": "Texas Sterling Constructon Co."
            },
            {
                "project_no": "40-00294",
                "name": "Citywide Bridge Program",
                "scope": "Citywide Bridge Program This project provides funding to replace existing deficient and deteriorated bridges and\/or build new bridges within the City limits. City will pay costs associated with larger hydraulic capacity, right of way acquisition, utility",
                "status": "UNDER CONSTRUCTION",
                "function": "TRANSPORTATION",
                "budget": 24145824.91,
                "spent": 18265910.97,
                "consultant": "SEA and Jacobs",
                "contractor": ""
            },
            {
                "project_no": "40-00292",
                "name": "Callaghan Rd (Loop 410 to Bandera Road)",
                "scope": "Callaghan Rd (IH 410 to SP 421) Reconstruct and widen Callaghan to four lanes with a continuous left-turn lane in some locations. Curbs, sidewalks, driveway approaches, traffic and drainage improvements added as needed. Cost reflects City of San Antonio",
                "status": "UNDER CONSTRUCTION",
                "function": "TRANSPORTATION",
                "budget": 21181956.12,
                "spent": 19292622.8,
                "consultant": "CDS Muery",
                "contractor": "Harper Brothers Construction LLC"
            },
            {
                "project_no": "40-00316",
                "name": "Theo Avenue & Malone Avenue Corridors",
                "scope": "Theo Avenue & Malone Avenue Corridors Reconstruct to available funds the roadways with curbs, sidewalks, driveway approaches, lighting, bicycle lanes, drainage and traffic improvements as needed.",
                "status": "COMPLETE",
                "function": "TRANSPORTATION",
                "budget": 20942972.15,
                "spent": 18546234.01,
                "consultant": "LNV, Inc.",
                "contractor": "Capital Excavation Company"
            },
            {
                "project_no": "40-00290",
                "name": "Blanco Rd Ph II (Edison-El Monte & Olmos",
                "scope": "Blanco Rd Ph II (Edison-El Monte & Olmos Reconstruct Blanco between Edison and El Monte, and between Olmos Creek and Jackson Keller with curbs, sidewalks, driveway approaches and necessary drainage and traffic signal improvements.  This is a continuation",
                "status": "COMPLETE",
                "function": "TRANSPORTATION",
                "budget": 18820354.45,
                "spent": 17702147.96,
                "consultant": "Civil Engineering Consultants",
                "contractor": "E-Z Bel Construction, LLC"
            },
            {
                "project_no": "40-00357",
                "name": "HemisFair Park",
                "scope": "HemisFair Park This project funds the restoration of historic buildings, including the Magik Theatre, a civic park and the installation of a play structure, landscaping, and other improvements for an arts plaza \/ children's square. This project is based",
                "status": "COMPLETE",
                "function": "RECREATION & CULTURE",
                "budget": 18129494.6,
                "spent": 18165983.71,
                "consultant": "MIG, GGN, Fisher Heck",
                "contractor": "Joeris Gen. Cont., JC Stoddard"
            },
            {
                "project_no": "40-00413",
                "name": "Witte Museum",
                "scope": "Witte Museum Leverage funding for major renovations and improvements to the Witte Museum complex.",
                "status": "COMPLETE",
                "function": "GENERAL GOVERNMENT",
                "budget": 17201615.67,
                "spent": 16021615.67,
                "consultant": "Lake Flato\/Ford Powell Carson",
                "contractor": "Linbeck Construction"
            },
            {
                "project_no": "40-00421",
                "name": "Hemisfair Area Street Redevelopment",
                "scope": "Hemisfair  Area Street Redevelopment This project provides funding to construct and reconfigure Dakota Street, North Street, South Street, Tower of the Americas Way, Indianola Street, Matagorda Street, Santa Clara Place, and Water Street within the Hemis",
                "status": "COMPLETE",
                "function": "TRANSPORTATION",
                "budget": 17115917.57,
                "spent": 15604577.56,
                "consultant": "HDR Engineering, Inc.",
                "contractor": "Jerdon Construction"
            },
            {
                "project_no": "40-00327",
                "name": "McCullough Avenue Area Drainage",
                "scope": "McCullough Avenue Area Drainage Design and construct storm drain systems and reconstruct the affected roadways to reduce the storm water runoff to the lower level of IH 35.",
                "status": "UNDER CONSTRUCTION",
                "function": "PUBLIC HEALTH & SAFETY",
                "budget": 15156646.24,
                "spent": 10777968.57,
                "consultant": "HNTB Corporation",
                "contractor": "Jordon Foster Construction"
            },
            {
                "project_no": "40-00314",
                "name": "Redland Rd North (1604 to Ridgewood Pkwy",
                "scope": "Redland Rd North (1604 to Ridgewood Pkwy) This project provides funds to reconstruct and widen Redland with a continuous turn lane in sections with bike lanes, curbs, sidewalks, driveway approaches, traffic signal improvements and drainage improvements a",
                "status": "UNDER CONSTRUCTION",
                "function": "TRANSPORTATION",
                "budget": 13984981.21,
                "spent": 10672441.77,
                "consultant": "Freese and Nichols, Inc.",
                "contractor": "J3 Company, LLC"
            },
            {
                "project_no": "40-00425",
                "name": "Hausman Road (Loop 1604 to IH 10)",
                "scope": "Hausman Road (Loop 1604 to IH 10) This project will provide drainage funding to widen and reconstruct Hausman Rd. Drainage improvements will include an underground storm drain system, including acquisition of necessary right-of-way.",
                "status": "COMPLETE",
                "function": "PUBLIC HEALTH & SAFETY",
                "budget": 13500000,
                "spent": 12449558.86,
                "consultant": "",
                "contractor": "Sundt Construction"
            },
            {
                "project_no": "40-00313",
                "name": "Redland Rd South (1604 to Jones Maltsber",
                "scope": "Redland Rd South (1604 to Jones Maltsberger) This project provides the funds to reconstruct and widen Redland with a continuous turn lane in sections with bike lanes, curbs, sidewalks, driveway approaches, traffic signal improvements and drainage improve",
                "status": "COMPLETE",
                "function": "TRANSPORTATION",
                "budget": 12309422.96,
                "spent": 11333275.38,
                "consultant": "Civil Engineering Consultants",
                "contractor": "S.J. Louis Construction"
            },
            {
                "project_no": "40-00287",
                "name": "36th St Ph III B (Billy Mitchell-Gen.Hud",
                "scope": "36th St Ph III B (Billy Mitchell-Gen.Hud This project will reconstruct the intersection at 36th and Bangor to include turn lanes, install new traffic signal, new curbs and new sidewalks along both sides of 36th Street. This project may include acquisitio",
                "status": "UNDER CONSTRUCTION",
                "function": "TRANSPORTATION",
                "budget": 11238464.21,
                "spent": 9104229.96,
                "consultant": "Civil Engineering Consultants",
                "contractor": "Shannon-Monk, Inc."
            },
            {
                "project_no": "40-00424",
                "name": "Goliad Rd (SE Military Dr. to Loop 410)",
                "scope": "Goliad Rd (SE Military Dr. to Loop 410) This project will construct drainage improvements along Goliad and reconstruct the roadway with curbs, sidewalks and driveway approaches as needed, including acquisition of necessary right of way.",
                "status": "UNDER CONSTRUCTION",
                "function": "PUBLIC HEALTH & SAFETY",
                "budget": 10759248.74,
                "spent": 10759248.74,
                "consultant": "CDS Muery",
                "contractor": "Texas Sterling Construction"
            },
            {
                "project_no": "40-00426",
                "name": "Redland Rd N(1604-RidgewoodPkwy)Drainage",
                "scope": "Redland Rd N(1604-RidgewoodPkwy)Drainage This project provides funding to reconstruct and widen Redland to five lanes which will include bike lanes, curbs, sidewalks, driveway approaches, traffic signal improvements and drainage improvements as needed. T",
                "status": "UNDER CONSTRUCTION",
                "function": "PUBLIC HEALTH & SAFETY",
                "budget": 10700000,
                "spent": 7051497.88,
                "consultant": "Freese and Nichols, Inc.",
                "contractor": "J3 Company, LLC"
            },
            {
                "project_no": "40-00328",
                "name": "Menger Creek Drainage",
                "scope": "Menger Creek Drainage Construct channel improvements from North Walters to Rio Grande and improve the Rio Grande crossing and the railroad crossing.",
                "status": "COMPLETE",
                "function": "PUBLIC HEALTH & SAFETY",
                "budget": 10399949.97,
                "spent": 9415970.14,
                "consultant": "CAS Consulting and Services, Inc.",
                "contractor": "E-Z Bel Construction, LLC"
            },
            {
                "project_no": "40-00302",
                "name": "E. Commerce (N. Rio Grande to E. Houston",
                "scope": "E. Commerce (N. Rio Grande to E. Houston This project provides funds to improve the East Commerce roadway, sidewalks and drainage as appropriate between Rio Grande to Houston.",
                "status": "COMPLETE",
                "function": "TRANSPORTATION",
                "budget": 10021254.93,
                "spent": 8365878.88,
                "consultant": "Bain Medina Bain, Inc.",
                "contractor": "Capital Excavation Company"
            },
            {
                "project_no": "40-00350",
                "name": "District 10 Senior Center",
                "scope": "District 10 Senior Center Development of a multi-use Senior Center in Council District 10 to provide for multi- generational programming.",
                "status": "COMPLETE",
                "function": "RECREATION & CULTURE",
                "budget": 9989821.25,
                "spent": 9865604.69,
                "consultant": "Rehler Vaughn & Koone, Inc.",
                "contractor": "Guido Brothers Construction"
            },
            {
                "project_no": "40-00295",
                "name": "Cupples Rd (Merida St to Castroville Rd)",
                "scope": "Cupples Rd (Merida St to Castroville Rd) Reconstruct and widen Cupples to four lanes including curbs, sidewalks, driveway approaches, and traffic and drainage improvements as needed.",
                "status": "COMPLETE",
                "function": "TRANSPORTATION",
                "budget": 9498654.68,
                "spent": 8087524.67,
                "consultant": "TEDSI, Infrastructure Group, Inc.",
                "contractor": "Jordan-Foster Construction"
            },
            {
                "project_no": "40-00423",
                "name": "Belford Area Drainage",
                "scope": "Belford Area Drainage This project resulted from a drainage study, funded by the 2007 Bond Savings, which provided the reconstruction of Belford Drive from Utopia to Galway & Utopia Lane from Belford to 665-ft west of Belford, an underground drainage sys",
                "status": "COMPLETE",
                "function": "PUBLIC HEALTH & SAFETY",
                "budget": 8711008.08,
                "spent": 5847487.33,
                "consultant": "Freese and Nichols, Inc.",
                "contractor": "Jordan-Foster Construction"
            },
            {
                "project_no": "40-00307",
                "name": "Ingram Road (Culebra Road to Mabe Road)",
                "scope": "Ingram Road (Culebra Road to Mabe Road) This project will reconstruct and widen Ingram to a four lane roadway with bicycle facilities. Curbs, sidewalks, driveway approaches, traffic and drainage improvements will be added as needed.",
                "status": "COMPLETE",
                "function": "TRANSPORTATION",
                "budget": 8215702.85,
                "spent": 6252673.54,
                "consultant": "Lockwood, Andrews & Newnam, Inc.",
                "contractor": "Capital Excavation Company"
            },
            {
                "project_no": "40-00385",
                "name": "Pearsall Park (Phase II)",
                "scope": "Pearsall Park General park improvements consistent with the park's Master Plan.  Improvements to include elements of the Family Fun Zone & Fitness Challenge Zone actitivy areas, and 5K challenge trail.",
                "status": "COMPLETE",
                "function": "RECREATION & CULTURE",
                "budget": 8138412.72,
                "spent": 8063456.81,
                "consultant": "BWC Design",
                "contractor": "MJ Boyle General Contractors"
            },
            {
                "project_no": "40-00315",
                "name": "Tezel Road (Culebra Rd. to Timber Path)",
                "scope": "Tezel Road (Culebra Rd. to Timber Path) This project will provide funds to widen Tezel rd to four lanes with curbs, bike lanes and a continuous two way left turn lane. Construct drainage improvements and add or replace sidewalks as needed.",
                "status": "COMPLETE",
                "function": "TRANSPORTATION",
                "budget": 7747322.14,
                "spent": 6138684.88,
                "consultant": "Camacho-Hernandez & Associates",
                "contractor": "San Antonio Constructors"
            },
            {
                "project_no": "40-00333",
                "name": "West Avenue Low Water Crossing",
                "scope": "West Avenue Low Water Crossing Eliminate the low water crossing northeast of Nakoma and reconstruct the roadway as needed.  This project may include acquisition of necessary right of way.",
                "status": "COMPLETE",
                "function": "PUBLIC HEALTH & SAFETY",
                "budget": 7725065.04,
                "spent": 7370157.94,
                "consultant": "HALFF ASSOCIATES, INC.",
                "contractor": "J3 Company, LLC"
            },
            {
                "project_no": "40-00416",
                "name": "Fire Station 30 Replacement",
                "scope": "Fire Station 30 Replacement Construction of a new Fire Station 30 to replace the original Fire Station 30, built in 1967. This project includes land acquisition.",
                "status": "COMPLETE",
                "function": "PUBLIC HEALTH & SAFETY",
                "budget": 7721000,
                "spent": 5991810.1,
                "consultant": "Beaty Palmer Architects, Inc.",
                "contractor": "JJ Stokes Construction Company"
            },
            {
                "project_no": "40-00380",
                "name": "Northwest Area Recreational Facility",
                "scope": "Northwest Area Recreational Facility This project provides funding for a potential public\/private venture for the development of a recreational facility to service the northwest area of the city.",
                "status": "COMPLETE",
                "function": "RECREATION & CULTURE",
                "budget": 7323748.73,
                "spent": 5973749.07,
                "consultant": "Marmon Mok Architecture",
                "contractor": "Kopplow Construction"
            },
            {
                "project_no": "40-00309",
                "name": "Medical Center Intersection Imp. Ph IX",
                "scope": "Medical Center Intersection Imp. Ph IX continues to improve select intersections in the Medical Center Area.   This is a continuation of cooperation with the Medical Center Alliance initiated with the 2007-2012 Bond Program. The scope of the project is t",
                "status": "COMPLETE",
                "function": "TRANSPORTATION",
                "budget": 7235228.77,
                "spent": 7113187.49,
                "consultant": "Pape-Dawson Engineers, Inc.",
                "contractor": ""
            },
            {
                "project_no": "40-00326",
                "name": "Indian Creek Channel Phase II",
                "scope": "Indian Creek Channel Phase II Reconstruct portions of the Indian Creek Channel and upgrade the box culvert bridge at Ray Ellison to improve water conveyance.",
                "status": "COMPLETE",
                "function": "PUBLIC HEALTH & SAFETY",
                "budget": 7221264.97,
                "spent": 5441667.15,
                "consultant": "Maestas & Associates, Inc.",
                "contractor": "Construction Resolution Group"
            },
            {
                "project_no": "40-00419",
                "name": "Espada Rd (Loop 410 to E. Ashley Rd)",
                "scope": "Espada Rd (Loop 410 to E. Ashley Rd) This project provides funds to reconstruct and widen Espada from Loop 410 to East Ashley to include bike lanes, lighting, aesthetic enhancements and drainage improvements as needed. This project may include acquisitio",
                "status": "COMPLETE",
                "function": "TRANSPORTATION",
                "budget": 7117185.26,
                "spent": 6799387.5,
                "consultant": "Pape-Dawson Engineers, Inc.",
                "contractor": ""
            },
            {
                "project_no": "40-00409",
                "name": "District 9 New Branch Library",
                "scope": "District 9 New Branch Library Development of a branch library in Council District 9. This project will require the purchase of land.  Funding includes acquisition of the land.",
                "status": "COMPLETE",
                "function": "RECREATION & CULTURE",
                "budget": 7000000,
                "spent": 7000000,
                "consultant": "Alvidrez Architecture, Inc.",
                "contractor": "Davila Construction, Inc."
            },
            {
                "project_no": "40-00321",
                "name": "W.Vestal Pl. (Commercial Ave-Pleasanton",
                "scope": "W.Vestal Pl. (Commercial Ave-Pleasanton This project will provide funds to reconstruct West Vestal between Commercial and Pleasanton with curbs, sidewalks, driveway approaches and drainage improvements as needed to available funds.",
                "status": "COMPLETE",
                "function": "TRANSPORTATION",
                "budget": 6973683.73,
                "spent": 6318110.07,
                "consultant": "Fernandez, Frazer, White & Assoc",
                "contractor": "RL Jones LP"
            },
            {
                "project_no": "40-00348",
                "name": "District 3 Community Center",
                "scope": "District 3 Community Center This project develops a multi use Community Center in Council District 3 with the flexibility to partner with outside sources for programming and management. Project may include land acquisition.",
                "status": "COMPLETE",
                "function": "RECREATION & CULTURE",
                "budget": 6621990,
                "spent": 6545944.61,
                "consultant": "Debra Dockery Architects",
                "contractor": "Allbrite Constructors of Texas"
            },
            {
                "project_no": "40-00293",
                "name": "Cherry Street (Dawson St. to Milam St.)",
                "scope": "Cherry Street (Dawson St. to Milam St.) Reconstruct roadway with curbs, sidewalks, driveway approaches and underground drainage as required within available funding.",
                "status": "COMPLETE",
                "function": "TRANSPORTATION",
                "budget": 6243411.47,
                "spent": 5189224,
                "consultant": "Merrick & Company",
                "contractor": "Capital Excavation Company"
            },
            {
                "project_no": "40-00415",
                "name": "Fire Station 18 Replacement",
                "scope": "Fire Station 18 Replacement Construction of a new Fire Station 18 to replace the original Fire Station 18, built in 1957. This project includes land acquisition.",
                "status": "COMPLETE",
                "function": "PUBLIC HEALTH & SAFETY",
                "budget": 6181670,
                "spent": 6013203.93,
                "consultant": "MSA Architects",
                "contractor": "FA Nunnelly"
            },
            {
                "project_no": "40-00296",
                "name": "District 1 Area Pedestrian Mobility & St",
                "scope": "District 1 Area Pedestrian Mobility & Street This provides funds to construct pedestrian mobility and street improvement projects.",
                "status": "UNDER CONSTRUCTION",
                "function": "TRANSPORTATION",
                "budget": 6068000,
                "spent": 4872665.79,
                "consultant": "",
                "contractor": ""
            },
            {
                "project_no": "40-00332",
                "name": "Sapphire & Flora Mae (Billy to Alfred Dr",
                "scope": "Sapphire & Flora Mae (Billy to Alfred Dr) Improve area drainage by installing a storm sewer system and the reconstruction of multiple roadways in the neighborhood with curbs, sidewalks and driveway approaches as needed.",
                "status": "COMPLETE",
                "function": "PUBLIC HEALTH & SAFETY",
                "budget": 6045803.68,
                "spent": 6045803.68,
                "consultant": "Klotz Associates, Inc.",
                "contractor": "EZ-Bel Construction, LCC"
            },
            {
                "project_no": "40-00407",
                "name": "District 2 New Branch Library",
                "scope": "District 2 New Branch Library Design and construction of a branch library in Council District 2. There is a commitment for the donation of land for this project, as such funding does not include resources for the acquisition of land.",
                "status": "COMPLETE",
                "function": "RECREATION & CULTURE",
                "budget": 6000000,
                "spent": 5865435.43,
                "consultant": "OCO, LPA",
                "contractor": "Davila Construction, Inc."
            },
            {
                "project_no": "40-00331",
                "name": "Quail Creek Tributary Drainage",
                "scope": "Quail Creek Tributary Drainage Improve the drainage in Quail Creek in the vicinity of Loop 410 and northward with channel and bridge improvements. This project may include acquisition of necessary right of way.",
                "status": "COMPLETE",
                "function": "PUBLIC HEALTH & SAFETY",
                "budget": 5516105.65,
                "spent": 3039854.19,
                "consultant": "Atkins North America, Inc",
                "contractor": "Capital Excavation Company"
            },
            {
                "project_no": "40-00303",
                "name": "Frio City Rd Sidewalks (Brazos-W Malone)",
                "scope": "Frio City Rd Sidewalks (Brazos-W Malone) Construct sidewalks and curbs along Frio City as appropriate and make necessary road improvements to support the project.",
                "status": "COMPLETE",
                "function": "TRANSPORTATION",
                "budget": 4506252.35,
                "spent": 4506252.35,
                "consultant": "R.J. Rivera Assoaciates, Inc.",
                "contractor": "EZ-Bel Construction, LCC"
            },
            {
                "project_no": "40-00308",
                "name": "Marbach Road, Phase II B",
                "scope": "Marbach Road, Phase II B This project designs and reconstructs Marbach from Meadow Way to Loop 410 with curbs, sidewalks, driveway approaches, underground drainage and other improvements as needed. This is the continuation of the 2007-2012 bond project n",
                "status": "COMPLETE",
                "function": "TRANSPORTATION",
                "budget": 4503828.84,
                "spent": 4503828.84,
                "consultant": "Bain Medina Bain, Inc.",
                "contractor": "San Antonio Constructors"
            },
            {
                "project_no": "40-00428",
                "name": "Upper Woodlawn Drainage",
                "scope": "Upper Woodlawn Drainage Construct drainage improvements in the Upper Woodlawn Lake area. Project was chosen from those identified in a study funded by 2007-2012 Bond savings. - St. Cloud Storm drain System Option 2: Culvert improvements at E. Sunshine Dr",
                "status": "COMPLETE",
                "function": "PUBLIC HEALTH & SAFETY",
                "budget": 4472961.35,
                "spent": 4109348.83,
                "consultant": "San Antonio Design Group",
                "contractor": ""
            },
            {
                "project_no": "40-00305",
                "name": "Hardy Oak (Stone Oak Pkwy-Knights Cross)",
                "scope": "Hardy Oak (Stone Oak Pkwy-Knights Cross) This project constructs a new four lane divided roadway from Stone Oak to Knights Cross with bicycle lanes, curbs, sidewalks, driveway approaches, traffic signal and drainage improvements as needed. This project m",
                "status": "COMPLETE",
                "function": "TRANSPORTATION",
                "budget": 4415666.19,
                "spent": 4415666.19,
                "consultant": "Vickrey & Associates, Inc.",
                "contractor": "DNT Construction"
            },
            {
                "project_no": "40-00351",
                "name": "Elmendorf Park",
                "scope": "Elmendorf Park This project provides funds for general park improvements to include the addition of basic park amenities complementary to City of San Antonio\/Bexar County\/San Antonio River Authority drainage improvements as well as Westside Creeks Restor",
                "status": "COMPLETE",
                "function": "RECREATION & CULTURE",
                "budget": 4377260.8,
                "spent": 4377260.8,
                "consultant": "San Antonio River Authority",
                "contractor": ""
            },
            {
                "project_no": "40-00430",
                "name": "Hardberger Park",
                "scope": "Hardberger Park Continued development of the new Urban Ecology Center, based on the park's Master Plan, to possibly include a Gathering Hall, courtyard developemnt, parking expansion and a traffic deceleration lane from N.W. Military Highway.",
                "status": "COMPLETE",
                "function": "RECREATION & CULTURE",
                "budget": 4287000,
                "spent": 4309400,
                "consultant": "Lake Flato",
                "contractor": "Guido Brothers Construction"
            },
            {
                "project_no": "40-00405",
                "name": "Central Library",
                "scope": "Central Library Renovations, repairs, upgrades and space reconfiguration to the to the Central Library facility.",
                "status": "COMPLETE",
                "function": "RECREATION & CULTURE",
                "budget": 4147500,
                "spent": 4144535.35,
                "consultant": "Marmon Mok Architecture",
                "contractor": "Climatec LLC."
            },
            {
                "project_no": "40-00318",
                "name": "W.Huisache (Zarzamora  to Kampmann Blvd)",
                "scope": "W.Huisache (Zarzamora  to Kampmann Blvd) Reconstruct the existing roadway with new curbs and sidewalks.",
                "status": "COMPLETE",
                "function": "TRANSPORTATION",
                "budget": 4095288.46,
                "spent": 4095288.46,
                "consultant": "AIA Engineers, Ltd.",
                "contractor": "Pronto Sandblasting and Coating"
            },
            {
                "project_no": "40-00324",
                "name": "Belfast & Janda Susan Area Drainage",
                "scope": "Belfast & Janda Susan Area Drainage Construct to available funds a channel and underground storm drain system with street reconstruction to include curbs, sidewalks, and driveway approaches as needed.",
                "status": "COMPLETE",
                "function": "PUBLIC HEALTH & SAFETY",
                "budget": 4033694.54,
                "spent": 3529435.22,
                "consultant": "Bury & Partners-SA, Inc.",
                "contractor": "San Antonio Constructors"
            },
            {
                "project_no": "40-00310",
                "name": "Peggy Drive Extension",
                "scope": "Peggy Drive Extension This project constructed a new roadway extension of Peggy Drive with curbs and sidewalks providing neighborhood access to East Houston as well as drainage improvements which included a bridge crossing constructed at Rosillo Creek Tr",
                "status": "COMPLETE",
                "function": "TRANSPORTATION",
                "budget": 3875531.07,
                "spent": 3875531.07,
                "consultant": "Cude Engineers",
                "contractor": "CRG Construction"
            },
            {
                "project_no": "40-00429",
                "name": "Westwood Village, Phase II",
                "scope": "Westwood Village, Phase II Construct a detention basin west of Pinn adjacent to Westwood Village Creek to improve drainage.  This project is a continuation of the Phase I project funded from the 2007-2012 Bond Program. This project may include acquisitio",
                "status": "COMPLETE",
                "function": "PUBLIC HEALTH & SAFETY",
                "budget": 3862084.99,
                "spent": 2051826.42,
                "consultant": "Cude Engineers",
                "contractor": "Alamo City Constructors"
            },
            {
                "project_no": "40-00422",
                "name": "Villaret Blvd (Highway 16 to Zarzamora)",
                "scope": "Villaret Blvd (Highway 16 to Zarzamora) Reconstruct Villaret with curbs, sidewalks, driveway approaches, bike lanes, traffic and drainage improvements as needed. This is a partnership project with Palo Alto College.",
                "status": "COMPLETE",
                "function": "TRANSPORTATION",
                "budget": 3700000,
                "spent": 3700000,
                "consultant": "Bain Medina Bain",
                "contractor": "Pronto Sandblasting and Coating"
            },
            {
                "project_no": "40-00329",
                "name": "Mountain View Estates, Ph III Drainage",
                "scope": "Mountain View Estates, Ph III Drainage Install drainage system that ties into an existing box culvert system on Rogers and outfalls into a tributary of Culebra Creek to resolve flooding issues in the Mountain View Estates area. Project will complement Ph",
                "status": "COMPLETE",
                "function": "PUBLIC HEALTH & SAFETY",
                "budget": 3640531.79,
                "spent": 3640531.79,
                "consultant": "KFW Engineers & Surveying",
                "contractor": "RL Jones LP"
            },
            {
                "project_no": "40-00406",
                "name": "Children's Museum",
                "scope": "Children's Museum Leverage funding for the Children's Museum relocation and expansion to increase its accessibility to San Antonio families and provide additional education programming to young children. This project may include land acquisition.",
                "status": "COMPLETE",
                "function": "RECREATION & CULTURE",
                "budget": 2979901.69,
                "spent": 2979901.69,
                "consultant": "",
                "contractor": ""
            },
            {
                "project_no": "40-00306",
                "name": "Higgins Road & Classen Road Intersection",
                "scope": "Higgins Road & Classen Road Intersection Install left-turn lanes at key intersections between Santa Gertrudis and Corian Springs Drive.  This project may include acquisition of necessary right of way.",
                "status": "COMPLETE",
                "function": "TRANSPORTATION",
                "budget": 2657115.15,
                "spent": 2657115.15,
                "consultant": "Omega Engineers, Inc.",
                "contractor": "Pronto Sandblasting"
            },
            {
                "project_no": "40-00304",
                "name": "Frio Street (Commerce to Cesar Chavez)",
                "scope": "Frio Street (Commerce to Cesar Chavez) This project will improve pedestrian connectivity on Frio Street between Commerce and Cesar Chavez. Aesthetic and lighting enhancements will be added as appropriate and within available funding. This project may inc",
                "status": "UNDER CONSTRUCTION",
                "function": "TRANSPORTATION",
                "budget": 2573250.39,
                "spent": 1962279.77,
                "consultant": "CH2M Hill",
                "contractor": "E-Z Bel Construction, LLC"
            },
            {
                "project_no": "40-00299",
                "name": "Commerce Corridor",
                "scope": "Commerce Corridor Improve pedestrian connectivity on Commerce between Frio and Santa Rosa.   Aesthetic and lighting enhancements will be added as appropriate and within available funding. This project may include acquisition of necessary right of way.",
                "status": "UNDER DESIGN",
                "function": "TRANSPORTATION",
                "budget": 2500000,
                "spent": 213757.19,
                "consultant": "URS Corporation",
                "contractor": ""
            },
            {
                "project_no": "40-00291",
                "name": "Buena Vista Corridor",
                "scope": "Buena Vista Corridor Improve pedestrian connectivity on Buena Vista between Frio and Santa Rosa.   Aesthetic and lighting enhancements will be added as appropriate and within available funding. This project may include acquisition of necessary right of w",
                "status": "UNDER DESIGN",
                "function": "TRANSPORTATION",
                "budget": 2500000,
                "spent": 250120.48,
                "consultant": "URS Corporation\/AECOM",
                "contractor": ""
            },
            {
                "project_no": "40-00384",
                "name": "Panther Springs Park",
                "scope": "Panther Springs Park General park improvements to include the development of a walking trail to the Parman Library.",
                "status": "COMPLETE",
                "function": "RECREATION & CULTURE",
                "budget": 2500000,
                "spent": 2500000,
                "consultant": "Terra Design Group, Inc.",
                "contractor": "Amstar, Inc."
            },
            {
                "project_no": "40-00356",
                "name": "Greater Mission Recreational Facility",
                "scope": "Greater Mission Recreational Facility Development of multi-use recreational facility with the flexability to partner with outside sources for programming and management",
                "status": "COMPLETE",
                "function": "RECREATION & CULTURE",
                "budget": 2490291.09,
                "spent": 2490291.09,
                "consultant": "Marmon Mok Architecture",
                "contractor": "Malitz Construction, Inc."
            },
            {
                "project_no": "40-00330",
                "name": "Mud Creek Tributary A Drainage",
                "scope": "Mud Creek Tributary A Drainage Improve the existing channel and improve drainage to remove properties from the floodplain. This project may include acquisition of necessary right of way.",
                "status": "COMPLETE",
                "function": "PUBLIC HEALTH & SAFETY",
                "budget": 2463390.76,
                "spent": 2005931.42,
                "consultant": "S&B Infrastructure, Ltd.",
                "contractor": "E-Z Bel Construction, LLC"
            },
            {
                "project_no": "40-00298",
                "name": "Cesar Chavez Corridor",
                "scope": "Cesar Chavez Corridor Improve pedestrian connectivity on Cesar Chavez between Frio and Santa Rosa. Aesthetic and lighting enhancements will be added as appropriate and within available funding. This project may include acquisition of necessary right of w",
                "status": "UNDER DESIGN",
                "function": "TRANSPORTATION",
                "budget": 2400000,
                "spent": 217417.38,
                "consultant": "URS Corporation\/AECOM",
                "contractor": ""
            },
            {
                "project_no": "40-00417",
                "name": "Stray Animal Kennels",
                "scope": "Stray Animal Kennels Construction of animal kennels to increase the capacity to house stray animals.",
                "status": "COMPLETE",
                "function": "GENERAL GOVERNMENT",
                "budget": 2199901.8,
                "spent": 2199901.8,
                "consultant": "F.A. Nunnelly",
                "contractor": "FA Nunnelly"
            },
            {
                "project_no": "40-00349",
                "name": "District 5 Senior Center",
                "scope": "District 5 Senior Center Renovation of the Normoyle Park Community Center for multi- generational programming and senior activities in Council District 5. Project may include computer classroom, arts and crafts room, dance and exercise area, kitchen and",
                "status": "COMPLETE",
                "function": "RECREATION & CULTURE",
                "budget": 2056576.54,
                "spent": 2056576.54,
                "consultant": "Alvidrez Architecture, Inc.",
                "contractor": "Amstar, Inc."
            },
            {
                "project_no": "40-00301",
                "name": "Bulverde Rd & Classen Rd Realignment",
                "scope": "Bulverde Rd & Classen Rd Realignment Widen and realign Bulverde and Classen Roads south of Loop 1604. Road will be two lanes in each direction divided by a raised median, with curbs, sidewalks and a hike and bike path.  This is a continuation of the proj",
                "status": "COMPLETE",
                "function": "TRANSPORTATION",
                "budget": 2000000,
                "spent": 1592846.46,
                "consultant": "",
                "contractor": ""
            },
            {
                "project_no": "40-00374",
                "name": "Martin Luther King Park (2012 Bond)",
                "scope": "Martin Luther King Park This project provides funding for general park rehabilitation and improvements including site grading, entry and circulation enhancements.",
                "status": "COMPLETE",
                "function": "RECREATION & CULTURE",
                "budget": 2000000,
                "spent": 1825912.97,
                "consultant": "Halff Associates, Inc.",
                "contractor": "J3 Company, LLC"
            },
            {
                "project_no": "40-00370",
                "name": "Lone Star Recreational Facility",
                "scope": "Lone Star Recreational Facility This project provides funds for the development of a recreational facility in the Lone Star neighborhood located in District 5 which may include land acquisition.",
                "status": "COMPLETE",
                "function": "RECREATION & CULTURE",
                "budget": 1844113.26,
                "spent": 1844113.26,
                "consultant": "Luna Architects",
                "contractor": ""
            },
            {
                "project_no": "40-00391",
                "name": "San Pedro Springs Park",
                "scope": "San Pedro Springs Park Rehabilitation and development of park infrastructure to include walking trails, security and landscape lighting and park amenities.",
                "status": "COMPLETE",
                "function": "RECREATION & CULTURE",
                "budget": 1775809.95,
                "spent": 1775809.95,
                "consultant": "Beaty Palmer Architects, Inc.",
                "contractor": "Allbrite Constructors of Texas"
            },
            {
                "project_no": "40-00365",
                "name": "Lady Bird Johnson Park",
                "scope": "Lady Bird Johnson Park This project provides funds for general park improvements including renovations to the Fisher Softball Complex, park entry improvements, and parking improvements.",
                "status": "COMPLETE",
                "function": "RECREATION & CULTURE",
                "budget": 1595732.56,
                "spent": 1595732.56,
                "consultant": "LGA \/ Weave",
                "contractor": "Crownhill Builders"
            },
            {
                "project_no": "40-00325",
                "name": "Elmendorf Lake Area Drainage",
                "scope": "Elmendorf Lake Area Drainage Implementation of projects near Elmendorf Lake to reduce erosion and improve water quality in the lake area. This will be a City contribution to a cooperative project with Bexar County and the San Antonio River Authority.",
                "status": "COMPLETE",
                "function": "PUBLIC HEALTH & SAFETY",
                "budget": 1500000,
                "spent": 1500000,
                "consultant": "San Antonio River Authority",
                "contractor": ""
            },
            {
                "project_no": "40-00408",
                "name": "District 6 New Library Site",
                "scope": "District 6 New Library Site Development of a branch library site in Council District 6.",
                "status": "COMPLETE",
                "function": "RECREATION & CULTURE",
                "budget": 1374036.38,
                "spent": 1318819.7,
                "consultant": "Marmon Mok Architecture",
                "contractor": "Kopplow Construction"
            },
            {
                "project_no": "40-00322",
                "name": "Wilson Blvd (Club-Donaldson) & Thespian",
                "scope": "Wilson Blvd (Club-Donaldson) & Thespian Island Construct new sidewalk and curb on the west side of Wilson and construct center median. Provide intersection improvements at Thespian Island located at Kampmann and Donaldson.",
                "status": "COMPLETE",
                "function": "TRANSPORTATION",
                "budget": 1271866.73,
                "spent": 1271866.73,
                "consultant": "Jones & Carter, Inc.",
                "contractor": "EZ-Bel Construction, LCC."
            },
            {
                "project_no": "40-00311",
                "name": "Presa Ramps at Highway 90",
                "scope": "Presa Ramps at Highway 90 This project constructs an off ramp for eastbound Highway 90 traffic and an on ramp for westbound Highway 90 traffic. Project funding reflects the City of San Antonio's contribution to a federally funded project. This project ma",
                "status": "COMPLETE",
                "function": "TRANSPORTATION",
                "budget": 1200000,
                "spent": 1041951.07,
                "consultant": "IDC, Inc.",
                "contractor": ""
            },
            {
                "project_no": "40-00339",
                "name": "Botanical Gardens",
                "scope": "Botanical Gardens This project provides funding for a new garden entry, educational facilities and a family Adventure Garden on the expanded garden footprint, from recent property acquisition.",
                "status": "COMPLETE",
                "function": "RECREATION & CULTURE",
                "budget": 1199715.25,
                "spent": 1699715.25,
                "consultant": "Mesa Design",
                "contractor": "Kopplow Construction"
            },
            {
                "project_no": "40-00340",
                "name": "Brackenridge Park",
                "scope": "Brackenridge Park This project will provide for development, improvement and rehabilitation of basic park infrastructure. The project may include perimeter park identification as well as improvements along the N. St. Mary's Street corridor.",
                "status": "COMPLETE",
                "function": "RECREATION & CULTURE",
                "budget": 1184386.86,
                "spent": 1184386.86,
                "consultant": "Rialto Studio, Inc.",
                "contractor": "Stoddard"
            },
            {
                "project_no": "40-00286",
                "name": "36th Street & Bangor Drive Intersection",
                "scope": "36th Street & Bangor Drive Intersection Reconstruct intersection at 36th and Bangor to include turn lanes.  Install new traffic signal and new curbs and sidewalks along both sides of 36th Street.  This project may include acquisition of necessary right o",
                "status": "COMPLETE",
                "function": "TRANSPORTATION",
                "budget": 1100000,
                "spent": 930694.21,
                "consultant": "San Antonio Design Group",
                "contractor": "E-Z Bel Construction, LLC"
            },
            {
                "project_no": "40-00375",
                "name": "McAllister Park",
                "scope": "McAllister Park General park improvements to include trail system rehabilitation.",
                "status": "COMPLETE",
                "function": "RECREATION & CULTURE",
                "budget": 1029265.72,
                "spent": 1029265.72,
                "consultant": "Coltrane, Fernandez, Zavala Group",
                "contractor": "Crownhill Builders"
            },
            {
                "project_no": "40-00337",
                "name": "Alamo Plaza Park",
                "scope": "Alamo Plaza Park This project provides funding for general public plaza improvements.",
                "status": "PRE-CONSTRUCTION",
                "function": "RECREATION & CULTURE",
                "budget": 1000000,
                "spent": 456234.6,
                "consultant": "",
                "contractor": ""
            },
            {
                "project_no": "40-00412",
                "name": "San Antonio Museum of Art",
                "scope": "San Antonio Museum of Art Leverage funding for the relocation of the San Antonio Museum of Art's central physical plant.",
                "status": "COMPLETE",
                "function": "GENERAL GOVERNMENT",
                "budget": 999999.9,
                "spent": 999999.9,
                "consultant": "Jackson & Ryan Architects",
                "contractor": ""
            },
            {
                "project_no": "40-00401",
                "name": "Woodlawn Lake Park",
                "scope": "Woodlawn Lake Park Development, improvement and rehabilitation of basic park infrastructure to possibly include improvements to the park's walking trail and east side playground area.",
                "status": "COMPLETE",
                "function": "RECREATION & CULTURE",
                "budget": 989505.86,
                "spent": 989505.86,
                "consultant": "Broussard Group",
                "contractor": "Crownhill Builders"
            },
            {
                "project_no": "40-00354",
                "name": "Gold Canyon Park",
                "scope": "Gold Canyon Park Phase I general park improvements to include establishing the initial parking lot, as well as, a new walking trail system that will be ADA compliant. Add alternates have been proposed to include a decorative fence partition that separate",
                "status": "COMPLETE",
                "function": "RECREATION & CULTURE",
                "budget": 972190.63,
                "spent": 972190.63,
                "consultant": "IDC, Inc.",
                "contractor": "Meyer's Concrete"
            },
            {
                "project_no": "40-00404",
                "name": "Carver Cultural Center",
                "scope": "Carver Cultural Center Improvements to include parking lot expansion and interior renovations.",
                "status": "COMPLETE",
                "function": "RECREATION & CULTURE",
                "budget": 966080.44,
                "spent": 966080.44,
                "consultant": "Rehler Vaughn & Koone, Inc.",
                "contractor": "Clearfield"
            },
            {
                "project_no": "40-00393",
                "name": "Southside Lions Park",
                "scope": "Southside Lions Park General park improvements to include construction of a dog park.",
                "status": "COMPLETE",
                "function": "RECREATION & CULTURE",
                "budget": 941920.58,
                "spent": 932581.55,
                "consultant": "Rehler Vaughn & Koone, Inc.",
                "contractor": "CGC General Contractors, Inc."
            },
            {
                "project_no": "40-00410",
                "name": "Guadalupe Cultural Arts Center (2012 Bond)",
                "scope": "Guadalupe Cultural Arts Center. Leverage funding for renovation of pharmacy bldg.",
                "status": "COMPLETE",
                "function": "RECREATION & CULTURE",
                "budget": 845000,
                "spent": 829000,
                "consultant": "Debra Dockery Architects",
                "contractor": "Pugh Constructors"
            },
            {
                "project_no": "40-00341",
                "name": "Cathedral Park",
                "scope": "Cathedral Park Phase II general park improvements, consistent with the park's Master Plan, for parking, trails, lighting and playground expansions.",
                "status": "COMPLETE",
                "function": "RECREATION & CULTURE",
                "budget": 840245.35,
                "spent": 840245.35,
                "consultant": "Rehler Vaughn & Koone, Inc.",
                "contractor": "Crownhill Builders"
            },
            {
                "project_no": "40-00319",
                "name": "W.Magnolia (Lake Blvd-Zarzamora)",
                "scope": "W.Magnolia (Lake Blvd-Zarzamora) Construct new curbs, sidewalks and pedestrian enhancements.",
                "status": "COMPLETE",
                "function": "TRANSPORTATION",
                "budget": 768942.51,
                "spent": 768942.51,
                "consultant": "Garcia & Wright Consulting Engineer",
                "contractor": "D. Plata Construction"
            },
            {
                "project_no": "40-00320",
                "name": "W.Mistletoe (San Antonio Ave-Zarzamora)",
                "scope": "W.Mistletoe (San Antonio Ave-Zarzamora) Reconstruct the existing roadway with new curbs and sidewalks.",
                "status": "COMPLETE",
                "function": "TRANSPORTATION",
                "budget": 764096.48,
                "spent": 764096.48,
                "consultant": "Gonzalez-De La Garza & Associates,",
                "contractor": "D. Plata Construction"
            },
            {
                "project_no": "40-00387",
                "name": "Pittman-Sullivan park",
                "scope": "Pittman-Sullivan Park General park improvements to include walking trail development.",
                "status": "COMPLETE",
                "function": "RECREATION & CULTURE",
                "budget": 763999.46,
                "spent": 763999.46,
                "consultant": "Terra Design Group, Inc.",
                "contractor": "HSC Electric, Inc."
            },
            {
                "project_no": "40-00361",
                "name": "Japanese Tea Gardens",
                "scope": "Japanese Tea Gardens General facility improvements to include perimeter fencing and wall stabilization.",
                "status": "COMPLETE",
                "function": "RECREATION & CULTURE",
                "budget": 749991.12,
                "spent": 749991.12,
                "consultant": "Dixie Watkins & Associates",
                "contractor": "Alpha Building Co., Sabinal Group"
            },
            {
                "project_no": "40-00344",
                "name": "Comanche Lookout Park",
                "scope": "Comanche Lookout Park General park improvements to include trail rehabilitation, parking addition, relocate toilet enclosure, landscaping and irrigation.",
                "status": "COMPLETE",
                "function": "RECREATION & CULTURE",
                "budget": 684929.08,
                "spent": 684929.08,
                "consultant": "Dixie Watkins & Associates",
                "contractor": "J. Sanchez Contracting"
            },
            {
                "project_no": "40-00372",
                "name": "Lou Kardon Park",
                "scope": "Lou Kardon Park Rehabilitation of the walking trail and development of general park improvements to include trail lighting, playground shade canopy, and picnic tables.",
                "status": "COMPLETE",
                "function": "RECREATION & CULTURE",
                "budget": 668080.58,
                "spent": 668080.58,
                "consultant": "Terra Design Group, Inc.",
                "contractor": "Crownhill Builders"
            },
            {
                "project_no": "40-00394",
                "name": "Stinson Park",
                "scope": "Stinson Park Rehabilitation and expansion of the San Antonio 5 Diamonds Little League complex.",
                "status": "COMPLETE",
                "function": "RECREATION & CULTURE",
                "budget": 648058.11,
                "spent": 648058.11,
                "consultant": "Rehler Vaughn & Koone, Inc.",
                "contractor": "Alpha Building Corporation"
            },
            {
                "project_no": "40-00338",
                "name": "Beacon Hill Park",
                "scope": "Beacon Hill Park Phase II expansion of the linear park development.",
                "status": "COMPLETE",
                "function": "RECREATION & CULTURE",
                "budget": 585827.24,
                "spent": 585827.24,
                "consultant": "Rehler Vaughn & Koone, Inc.",
                "contractor": "Harborth Construction"
            },
            {
                "project_no": "40-00395",
                "name": "Stone Oak Park",
                "scope": "Stone Oak Park This project provides funds for general park improvements and trail development.",
                "status": "COMPLETE",
                "function": "RECREATION & CULTURE",
                "budget": 570002.37,
                "spent": 548902.67,
                "consultant": "Terra Design Group, Inc.",
                "contractor": "ASD Consultants, Inc."
            },
            {
                "project_no": "40-00343",
                "name": "Collins Garden Park",
                "scope": "Collins Garden Park General park improvements to include a restroom replacement.",
                "status": "COMPLETE",
                "function": "RECREATION & CULTURE",
                "budget": 500000,
                "spent": 500000,
                "consultant": "BWC Design",
                "contractor": "Amstar, Inc."
            },
            {
                "project_no": "40-00353",
                "name": "Gilbert Garza Park",
                "scope": "Gilbert Garza Park General park improvements to include development of swimming pool shade canopies.",
                "status": "COMPLETE",
                "function": "RECREATION & CULTURE",
                "budget": 499982.68,
                "spent": 499982.68,
                "consultant": "Rehler Vaughn & Koone, Inc.",
                "contractor": "ASD Consultants, Inc."
            },
            {
                "project_no": "40-00378",
                "name": "Normoyle Park",
                "scope": "Normoyle Park General park improvements which may include a walking trail and softball field improvements.",
                "status": "COMPLETE",
                "function": "RECREATION & CULTURE",
                "budget": 498394.06,
                "spent": 498394.06,
                "consultant": "BWC Design",
                "contractor": "Amstar, Inc."
            },
            {
                "project_no": "40-00381",
                "name": "Olmos Basin Park",
                "scope": "Olmos Basin Park General park improvements to include security lighting, trail and parking amenities in proximity to the Jackson-Keller & McCullough Avenue area.",
                "status": "COMPLETE",
                "function": "RECREATION & CULTURE",
                "budget": 496172.28,
                "spent": 496172.28,
                "consultant": "Coltrane, Fernandez, Zavala Group",
                "contractor": "Consolitated Installation Services"
            },
            {
                "project_no": "40-00288",
                "name": "Bandera Rd & Eckhert Road Intersection",
                "scope": "Bandera Rd & Eckhert Road Intersection Reconstruct intersection with median modifications to improve left turn movements and extend existing turn lanes as needed.",
                "status": "COMPLETE",
                "function": "TRANSPORTATION",
                "budget": 492016.62,
                "spent": 492016.62,
                "consultant": "Kleinfelder Central, Inc.",
                "contractor": "San Antonio Constructors, Ltd."
            },
            {
                "project_no": "40-00360",
                "name": "Highland Park",
                "scope": "Highland Park General park and community center improvements and rehabilitation.",
                "status": "COMPLETE",
                "function": "RECREATION & CULTURE",
                "budget": 439766.44,
                "spent": 439766.44,
                "consultant": "Westeast Design Group, LLC",
                "contractor": "Sabinal Construction"
            },
            {
                "project_no": "40-00400",
                "name": "West End Park",
                "scope": "West End Park General park rehabilitation and improvements.",
                "status": "COMPLETE",
                "function": "RECREATION & CULTURE",
                "budget": 413275.39,
                "spent": 413275.39,
                "consultant": "Bury & Partners",
                "contractor": "Alpha Building Corporation"
            },
            {
                "project_no": "40-00389",
                "name": "Raintree Park",
                "scope": "Raintree Park Phase II general park improvements to include trail, pavilion, shade canopy over playground, and drinking fountain.",
                "status": "COMPLETE",
                "function": "RECREATION & CULTURE",
                "budget": 400000,
                "spent": 400000,
                "consultant": "FisherHeck Architects",
                "contractor": "J. Sanchez Contracting"
            },
            {
                "project_no": "40-00383",
                "name": "Palm Heights Park",
                "scope": "Palm Heights Park Rehabilitation and development of park infrastructure to include sidewalk repair, construction of a shade canopy structure, parking and roadway modifications and other park amenities.",
                "status": "COMPLETE",
                "function": "RECREATION & CULTURE",
                "budget": 399035.08,
                "spent": 399035.08,
                "consultant": "BWC Design",
                "contractor": "Amstar, Inc."
            },
            {
                "project_no": "40-00390",
                "name": "San Antonio Natatorium",
                "scope": "San Antonio Natatorium Rehabilitation of facility flooring, pool deck, roof ventilation, pool covers and facility infrastructure.",
                "status": "COMPLETE",
                "function": "RECREATION & CULTURE",
                "budget": 396391.17,
                "spent": 396391.17,
                "consultant": "Westeast Design Group, LLC",
                "contractor": "Davila Construction, Inc."
            },
            {
                "project_no": "40-00388",
                "name": "Pytel Park",
                "scope": "Pytel Park General park rehabilitation and improvements to include lighting enhancement at the baseball field area, new parking, and new sidewalks. An add alternate has been proposed to include a shade structure for the playground.",
                "status": "COMPLETE",
                "function": "RECREATION & CULTURE",
                "budget": 390676.68,
                "spent": 390676.68,
                "consultant": "Mask Landscape Architects",
                "contractor": "MGB Group, Inc."
            },
            {
                "project_no": "40-00358",
                "name": "Heritage Duck Pond Park",
                "scope": "Heritage Duck Pond Park General park rehabilitation and improvements.",
                "status": "COMPLETE",
                "function": "RECREATION & CULTURE",
                "budget": 390070.43,
                "spent": 390070.43,
                "consultant": "Terra Design Group, Inc.",
                "contractor": "Con-Cor, Inc."
            },
            {
                "project_no": "40-00379",
                "name": "Northampton Park",
                "scope": "Northampton Park General park improvements to include walking trail development and parking expansion.",
                "status": "COMPLETE",
                "function": "RECREATION & CULTURE",
                "budget": 376278.57,
                "spent": 393331.23,
                "consultant": "Terra Design Group, Inc.",
                "contractor": "MGB Group, Inc."
            },
            {
                "project_no": "40-00398",
                "name": "Tom Slick Creek Park",
                "scope": "Tom Slick Creek Park General park improvements.",
                "status": "COMPLETE",
                "function": "RECREATION & CULTURE",
                "budget": 363366.59,
                "spent": 363366.59,
                "consultant": "BWC Design",
                "contractor": "Crownhill Builders"
            },
            {
                "project_no": "40-00355",
                "name": "Golden Community Park",
                "scope": "Golden Community Park General park rehabilitation and improvements.",
                "status": "COMPLETE",
                "function": "RECREATION & CULTURE",
                "budget": 349894.68,
                "spent": 349894.68,
                "consultant": "Rehler Vaughn & Koone, Inc.",
                "contractor": "Alpha Building Corporation"
            },
            {
                "project_no": "40-00397",
                "name": "Thunderbird Hills Park",
                "scope": "Thunderbird Hills Park Land acquisition and initial development of a new city park in the area of Thunderbird Hills Neighborhood in District 7.  Improvements to include walking trail, parking, pavilion, playground (y donation & volunteers), and site amen",
                "status": "COMPLETE",
                "function": "RECREATION & CULTURE",
                "budget": 347588.77,
                "spent": 347588.77,
                "consultant": "Terra Design Group, Inc.",
                "contractor": "Con Cor Inc, Horizon International"
            },
            {
                "project_no": "40-00289",
                "name": "Bandera Rd & Tezel Rd Intersection",
                "scope": "Bandera Rd & Tezel Rd Intersection Reconstruct intersection with dual left turn lanes and traffic lane modifications as needed.",
                "status": "COMPLETE",
                "function": "TRANSPORTATION",
                "budget": 345406.96,
                "spent": 345406.96,
                "consultant": "Kleinfelder Central, Inc.",
                "contractor": "San Antonio Constructors, LTD."
            },
            {
                "project_no": "40-00363",
                "name": "Joe Ward Park",
                "scope": "Joe Ward Park General park improvements to include development of a splash pad at the park's swimming facility.",
                "status": "COMPLETE",
                "function": "RECREATION & CULTURE",
                "budget": 345367.3,
                "spent": 345367.3,
                "consultant": "Rialto Studio, Inc.",
                "contractor": "Horizon International Group"
            },
            {
                "project_no": "40-00352",
                "name": "French Creek Park",
                "scope": "French Creek Park Phase I development of general park improvements to include trail & parking.",
                "status": "COMPLETE",
                "function": "RECREATION & CULTURE",
                "budget": 344840.09,
                "spent": 350615.95,
                "consultant": "Rialto Studio, Inc.",
                "contractor": "FA Nunnelly"
            },
            {
                "project_no": "40-00382",
                "name": "Oscar Perez Park",
                "scope": "Oscar Perez Park General park improvements to include walking trail improvements.",
                "status": "COMPLETE",
                "function": "RECREATION & CULTURE",
                "budget": 343601.15,
                "spent": 343601.15,
                "consultant": "Kudela & Weinheimer, Inc.",
                "contractor": "TCL Construction Enterprises"
            },
            {
                "project_no": "40-00377",
                "name": "New Territories Park",
                "scope": "New Territories Park General park improvements to include trail and security lighting.",
                "status": "COMPLETE",
                "function": "RECREATION & CULTURE",
                "budget": 343286.79,
                "spent": 343286.79,
                "consultant": "Kudela & Weinheimer, Inc.",
                "contractor": "TCL Construction Enterprises"
            },
            {
                "project_no": "40-00346",
                "name": "Cuellar Park",
                "scope": "Cuellar Park General park improvements consistent with the park's Master Plan.",
                "status": "COMPLETE",
                "function": "RECREATION & CULTURE",
                "budget": 340819.94,
                "spent": 340819.94,
                "consultant": "Formerly Bury Inc., (Now Stantec)",
                "contractor": "Alpha Building Corporation"
            },
            {
                "project_no": "40-00336",
                "name": "Acme Park",
                "scope": "Acme Park General park rehabilitation and improvements to include walking trail enhancements.",
                "status": "COMPLETE",
                "function": "RECREATION & CULTURE",
                "budget": 338739.31,
                "spent": 338739.31,
                "consultant": "Formerly Bury Inc., (Now Stantec)",
                "contractor": "Alpha Building Corporation"
            },
            {
                "project_no": "40-00392",
                "name": "Scates Park",
                "scope": "Scates Park General park improvements to include pavilion, play swings, picnic tables, benches, walking trail, renovated open play area with irrigation, fencing, and solar lighting.",
                "status": "COMPLETE",
                "function": "RECREATION & CULTURE",
                "budget": 338633.83,
                "spent": 338633.83,
                "consultant": "Rehler Vaughn & Koone, Inc.",
                "contractor": "PSE Contracting"
            },
            {
                "project_no": "40-00368",
                "name": "Levi Strauss Park",
                "scope": "Levi Strauss Park General park rehabilitation and improvements.",
                "status": "COMPLETE",
                "function": "RECREATION & CULTURE",
                "budget": 332002.35,
                "spent": 332002.35,
                "consultant": "Formerly Bury Inc., (Now Stantec)",
                "contractor": "Alpha Building Corporation"
            },
            {
                "project_no": "40-00371",
                "name": "Los Angeles Heights Park",
                "scope": "Los Angeles Heights Park Basic park improvements to include playground development.",
                "status": "COMPLETE",
                "function": "RECREATION & CULTURE",
                "budget": 299996.91,
                "spent": 299996.91,
                "consultant": "Terra Design Group, Inc.",
                "contractor": "The GFP Group"
            },
            {
                "project_no": "40-00345",
                "name": "Copernicus Park",
                "scope": "Copernicus Park General park improvements and rehabilitation to include parking expansion.",
                "status": "COMPLETE",
                "function": "RECREATION & CULTURE",
                "budget": 290085.35,
                "spent": 290085.35,
                "consultant": "Bain Medina Bain, Inc.",
                "contractor": "San Antonio Constructors"
            },
            {
                "project_no": "40-00386",
                "name": "Pickwell Park",
                "scope": "Pickwell Park General park rehabilitation and improvements to include renovation of the existing restroom building, a new concrete trail, new walkways connecting existing amenities, a new picnic pad outfitted with table and grill, and a new pavilion. Add",
                "status": "COMPLETE",
                "function": "RECREATION & CULTURE",
                "budget": 288685.55,
                "spent": 288685.55,
                "consultant": "Mask Landscape Architects",
                "contractor": "Kopplow Construction"
            },
            {
                "project_no": "40-00403",
                "name": "Blue Star Arts Complex",
                "scope": "Blue Star Arts Complex Leverage funding toward the Blue Star Arts Complex capital expansion master plan.  This project may include land acquisition.",
                "status": "COMPLETE",
                "function": "RECREATION & CULTURE",
                "budget": 250000,
                "spent": 250000,
                "consultant": "Jim Poteet Architects",
                "contractor": ""
            },
            {
                "project_no": "40-00373",
                "name": "Mario Farias Park",
                "scope": "Mario Farias Park General park improvements.",
                "status": "COMPLETE",
                "function": "RECREATION & CULTURE",
                "budget": 249998.06,
                "spent": 249998.06,
                "consultant": "Bury & Partners",
                "contractor": "Alpha Building Corporation"
            },
            {
                "project_no": "40-00347",
                "name": "Dellview Park",
                "scope": "Dellview Park General park rehabilitation and improvements.",
                "status": "COMPLETE",
                "function": "RECREATION & CULTURE",
                "budget": 249728.78,
                "spent": 249728.78,
                "consultant": "Terra Design Group, Inc.",
                "contractor": "The GFP Group"
            },
            {
                "project_no": "40-00366",
                "name": "Lakeside Park",
                "scope": "Lakeside Park General park rehabilitation and improvements that will add a shade structure for the playground as well as improvements to the established trail system.",
                "status": "COMPLETE",
                "function": "RECREATION & CULTURE",
                "budget": 240741.79,
                "spent": 240741.79,
                "consultant": "Broussard Group",
                "contractor": "Straight Line Management"
            },
            {
                "project_no": "40-00376",
                "name": "Nani Falcone Park",
                "scope": "Nani Falcone Park General park improvements to include parking expansion and dog park.",
                "status": "COMPLETE",
                "function": "RECREATION & CULTURE",
                "budget": 211722.78,
                "spent": 212517.14,
                "consultant": "Rialto Studio, Inc.",
                "contractor": "FA Nunnelly"
            },
            {
                "project_no": "40-00359",
                "name": "Herrera Park",
                "scope": "Herrera Park General park rehabilitation and improvements to include new parking lot, basketball renovation, toilet enclosure, walkways.",
                "status": "COMPLETE",
                "function": "RECREATION & CULTURE",
                "budget": 199289.31,
                "spent": 199289.31,
                "consultant": "Terra Design Group, Inc.",
                "contractor": "Myers Concrete"
            },
            {
                "project_no": "40-00335",
                "name": "36th St. Park",
                "scope": "36th St. Park Initial development of a new park along 36th Street Corridor that may include land acquisition.",
                "status": "COMPLETE",
                "function": "RECREATION & CULTURE",
                "budget": 199180.24,
                "spent": 199180.24,
                "consultant": "Coltrane, Fernandez, Zavala Group",
                "contractor": "Con-Cor, Inc."
            },
            {
                "project_no": "40-00367",
                "name": "Lee's Creek Park",
                "scope": "Lee's Creek Park General park improvements which may include an outdoor classroom and instructional elements.",
                "status": "COMPLETE",
                "function": "RECREATION & CULTURE",
                "budget": 198139.57,
                "spent": 198139.57,
                "consultant": "Rialto Studio, Inc.",
                "contractor": "Ortiz Group, Inc."
            },
            {
                "project_no": "40-00369",
                "name": "Lincoln Park",
                "scope": "Lincoln Park Development, improvement and rehabilitation of basic park infrastructure to include walking trail development.",
                "status": "COMPLETE",
                "function": "RECREATION & CULTURE",
                "budget": 196764.66,
                "spent": 196764.66,
                "consultant": "Terra Design Group, Inc.",
                "contractor": "Myers Concrete"
            },
            {
                "project_no": "40-00362",
                "name": "Jim Mattox Park",
                "scope": "Jim Mattox Park Construct new pavilion, add walkways, portable toilet enclosure.",
                "status": "COMPLETE",
                "function": "RECREATION & CULTURE",
                "budget": 194496.7,
                "spent": 194496.7,
                "consultant": "Broussard Group",
                "contractor": "ASD Consultants, Inc."
            },
            {
                "project_no": "40-00342",
                "name": "Coliseum Park",
                "scope": "Coliseum Park General park improvements to include pavilion and security lighting development.",
                "status": "COMPLETE",
                "function": "RECREATION & CULTURE",
                "budget": 174092.59,
                "spent": 174092.59,
                "consultant": "Terra Design Group, Inc.",
                "contractor": "Myers Concrete"
            },
            {
                "project_no": "40-00396",
                "name": "Sunset Hills Park",
                "scope": "Sunset Hills Park Development of aquatic facility improvements.",
                "status": "COMPLETE",
                "function": "RECREATION & CULTURE",
                "budget": 170719.25,
                "spent": 170719.25,
                "consultant": "Rialto Studio, Inc.",
                "contractor": "Horizon International Group"
            },
            {
                "project_no": "40-00364",
                "name": "Kenwood Park",
                "scope": "Kenwood Park General park improvements, to possibly include basketball court renovations, playground shade and\/or portable restroom enclosure development.",
                "status": "COMPLETE",
                "function": "RECREATION & CULTURE",
                "budget": 148714.48,
                "spent": 148714.48,
                "consultant": "Terra Design Group, Inc.",
                "contractor": "The GFP Group"
            },
            {
                "project_no": "40-00399",
                "name": "Travis Park",
                "scope": "Travis Park General park improvements which may include electrical enhancements.",
                "status": "COMPLETE",
                "function": "RECREATION & CULTURE",
                "budget": 75000,
                "spent": 75000,
                "consultant": "CNG Engineering, PLL",
                "contractor": "Jamail & Smith Construction"
            }
        ]
    },
    "map": {
        "plotted": 352,
        "lines_drawn": 134,
        "citywide_count": 18,
        "rejected": 0,
        "plotted_usd": 1844833000,
        "citywide_usd": 205167000,
        "unplottable_usd": 0,
        "ledger_usd": 2050000000,
        "citywide_pct": 10,
        "file": "sa-bond-points.json",
        "note": "Every dollar in the ledger is either drawn on the map or listed beside it as citywide. The three shares are checked against the ledger total on every build and a mismatch refuses to publish."
    },
    "reprojection": {
        "ran": true,
        "max_m": 0.946,
        "checked": 370,
        "note": "Every project was reprojected from the State Plane values in the master list and checked against the same 370 points published by the City in WGS84. The largest disagreement is 0.946 meters."
    },
    "enrichment": {
        "source_packages": [
            "bond-project-line",
            "bond-project-lines",
            "bond-project-points"
        ],
        "projects_with_a_published_scope": 134,
        "projects_with_a_named_vendor": 57,
        "alignments": 134,
        "join_key": "SAPNo",
        "note": "The master list this page is built on does not publish a project number, a scope, a design schedule or a vendor. Sibling packages in the same catalog do, for a subset of the same projects, and they are joined here on the City project number rather than on the project name, which is spelled differently between the files.",
        "corrects_a_published_claim": "This page previously stated that the City publishes no contract or vendor data anywhere in its open data catalog. That was wrong, and it was wrong because the search that produced it swept dataset titles and keywords while vendor names are a column inside a dataset. The City names consultants and contractors on bond projects. Coverage is uneven and runs backwards in time: near complete on the 2012 program, partial on 2017, and absent from the current master list."
    },
    "caveats": {
        "budget_field_is_a_recorded_zero": "The field named \"Total Budget\" is a recorded zero on most projects, not a blank. Nothing in the record says whether that zero means the project has no separate total budget or that nobody entered one, so this page says \"recorded as zero\" and never \"missing\". Every dollar figure published here uses the Bond Budget and Bond Expenditures pair, each printed beside its coverage rate.",
        "a_rate_lives_inside_one_pair": "Four divisions are refused, not one: Total Expenditures by Total Budget, Bond Expenditures by Total Budget, Total Expenditures by Bond Budget, and any of those summed citywide before dividing. A rate is computed only within a pair. The record does not document what separates the two pairs and this page does not guess.",
        "schedule_is_self_reported": "No project carries a real date; every recorded construction end is a season. Whether a project is on schedule is the City own assessment, published here as the City own assessment and not independently checked.",
        "no_project_is_past_its_stated_end": "Measured, and deliberately reported with its ambiguity. No project sits past its own stated end while still incomplete. That is consistent with the City keeping these dates current, and equally consistent with a date being rolled forward whenever a project slips. The record carries no history of previous end dates, so it cannot distinguish the two and neither can this page.",
        "three_district_columns": "The record carries three council district columns and they do not agree on every project. This page reads the one named Council District throughout, publishes the disagreement, and does not resolve it, because switching between them would move money between districts on no stated basis.",
        "district_money_not_split": "A project that spans several council districts, or is recorded as citywide, is never divided between them. The record does not say how the money divides and inventing a split would be our figure, not the City's.",
        "programmes_differ": "The two bond programs are at different stages of delivery. A single citywide spend rate blends them and describes neither, so both are always shown.",
        "not_a_ranking": "A district with more bond money recorded against it is not better served. Propositions fund particular kinds of asset and those are not evenly spread across the city.",
        "a_project_is_not_a_place": "The coordinate on a project is a single recorded point, not the extent of the work. A street or drainage project covers a corridor that no single pin describes. Where the City publishes a real alignment for a project the map draws that instead of a pin, and citywide programs are listed beside the map rather than plotted, because their recorded coordinates are a downtown cluster rather than a location of work.",
        "vendors_are_recorded_unevenly": "The City names a consultant or a contractor on some bond projects, in older files published alongside the current master list. That coverage runs backwards in time: it is nearly complete on the 2012 program, partial on 2017, and absent from the current list. A project with no vendor named here is one the record does not name a vendor for, not one that had none.",
        "approved_is_not_spent": "Approved money is what voters authorised for a project. Expenditure is what the City records having spent so far. Neither is a promise about what the finished work will cost."
    },
    "field_notes": {
        "duplicate_district_columns": {
            "columns": [
                "Council District",
                "CD",
                "CD2"
            ],
            "council_district_eq_cd": 329,
            "cd_eq_cd2": 347,
            "of": 370,
            "used": "Council District",
            "note": "The record carries three council district columns and they do not agree on every project. This tool reads the one named Council District throughout. There is no basis in the record for preferring another, and switching between them would move money between districts, so the disagreement is published rather than resolved."
        },
        "duplicate_budget_column": {
            "columns": [
                "Bond Budget",
                "Bond_Budget2"
            ],
            "agree": 370,
            "of": 370,
            "note": "Bond_Budget2 is identical to Bond Budget on every project. It is not used and adds nothing."
        },
        "contact_column_excluded": {
            "column": "CPO",
            "note": "The record names a capital projects officer and a direct phone number on every project. It is read by nothing here and appears in no cube, CSV or API response. Same rule as the permit record, which mixes company names with private individuals: this tool aggregates, and republishing 50 named City staff with their direct lines is not what it is for."
        },
        "no_data_dictionary": {
            "checked": "2026-08-30",
            "note": "Unlike the building permits package, this one publishes no data dictionary; its eleven resources are all format variants of the same layer. So nothing in the record documents what separates the Total and Bond money pairs, and this tool does not guess."
        }
    },
    "source": {
        "name": "City of San Antonio - Bond Project master list",
        "dataset": "https:\/\/data.sanantonio.gov\/dataset\/bond-project",
        "resource": "843caeb3-389d-416b-a78e-73e82975ec72",
        "api": "https:\/\/data.sanantonio.gov\/api\/3\/action\/datastore_search_sql",
        "cadence": "The City states this list is updated monthly."
    }
}